Laserfiche WebLink
<br /> . <br />- Page 2 <br /> update on sidewalk Cleanin3' Information <br /> overtime to clean sidewalks, so the normal cleanin3' for them takes two or <br /> three days. <br /> All three of the cities contacte:i described the same conclitions am. <br /> circumstances that are encountered when keeping the sidewalks clean. The <br /> specific attachments all have limitations am. should be used for certain <br /> corrlitions. The vee-plow works best for nonnal conclitions, am. is the fastest <br /> way to clean the walkways. The snowblcmers are used for heavier corrlitions <br /> am. the process will take much longer. The blower also causes many residents <br /> to call am. c:anplain about sncM blown onto their yards. Another CXlllllOOI1 <br /> concern voiced by all three cities is that the sidewalks never seem to be <br /> clean. Every time the city plows or the County plows go by, the sidewalks <br /> need to be cleaned again. All three cities voiced some frustration trying to <br /> keep the walkways as clean as possible. The positive side is that by cleanin3' <br /> the walkways, the residents will have a clean walk that can be used for <br /> walking or jogging am. it provides for this activity to take place off the <br /> roadway, where walking or jogging could be much more dangeroUs. <br /> Same of the =ent equipment that we have could possibly be used. We did <br />. clean a short section of Lexington Avenue last week using the Massey-Ferguson <br /> tractor. The bucket is a-feet wide am. was used to push snow the best way <br /> possible. I contacted L - Z Company, who stated that they !'lOW have a 9-foot <br /> vee-plow that they could attach to the front bucket of this machine for <br /> $2,350. This may work when cleanin3' most of the current walkways am. trails <br /> that we have. The smaller sidewalks of COunty Road E lNOIlld be a little <br /> tougher to do. A Bobcat loader could be purchased with all of the attachments <br /> for $35,000 to $40,000. This smaller size machine lNOIlld work much better for <br /> all of our applications. The machine could also be used during the rest of <br /> the year for many other functions. The larger size Massey tractor would have <br /> some difficulty cleanin3' the Parks Trails until we could do some tree <br /> trilllming . The current machines that the other three cities are using cost in <br /> the range of $50,000 - $60,000. It should also be noted that we have <br /> corrlitions in some areas where the snow would actually have to be reIroVed and <br /> hauled away due to the lack of storage space. 'Ihese areas are prilllarily along <br /> Hamline Avenue, where we have a short distance between the back of the =b <br /> and retaining walls that were constructe:i to maintain the integrity of the <br /> local properties. This would be a labor intensive activity that would take a <br /> little longer to camplete. <br /> I will be available at the council work session if lOClre questions should o::nne <br /> up. <br /> IM/kl <br />- <br />~ <br />