Laserfiche WebLink
<br /> pl;111"11'1;1'Il'T n -.-..;!CLClion Meetina 2 4-Q7-9!3 -___ <br /> CASE #93-01; (ccmH..._) . <br /> the 3rd lot which is COll1Iroll open space for use by all <br /> -hI>rs of the Townhome Homeowner's Association. All of the <br /> east 40 feet of Lot 3 (lyin3' between Lot 2 ani the Highway <br /> ~ is in a drainage ani utility easement. An existin;J <br /> flCfNage --rtt exten:ls across the NE corner of Lot 3 J:ut <br /> does not infrin;Je on the 2 I:uildin3' lots. A 10 foot <br /> drainage ani utility easement runs across the front of the <br /> property, adjacent to Brueberry lane. '!he En;Jineer ani <br /> Public Works Director feel that these easements are <br /> adequate. '!he Final Plat is used as the base plan for the <br /> site Plan. '!he separate Final Plat Document will be <br /> available for city signatures follC7llin; Council approval of <br /> this application ani closin3' on the sale of the l'L'-'I:'= ty by <br /> the City ani Developer. <br /> b. All aspects of the site Plan are identical to the <br /> Preliminary Plan approved in February J:ut with greater <br /> refinement. '!he benn at the SW corner of the site is about <br /> 5' above the street ani driveway. '!be benn height alO1'XJ Old <br /> Highway 10 is 3' above the grade at the l::uilding line ani <br /> about 6 I above the street level. A drainage swale between <br /> the bJilding ani the benn will carry surface water to the <br /> north into the flCfNage easement ani to the south into the <br /> street. '!be storm sewer shown is existirg ani carries water <br /> iran the catch basins in the street to the NE corner of the . <br /> site where it empties into the flCfNage ..,,,,,..'''''''It. On March <br /> 24, 1993, the RCWD approved the drainage plan subject to <br /> payment of the cash surety to guarantee project COllpletion. <br /> All Ordinance requirements, in addition to the l:uilding <br /> setbacks, are met. <br /> 3. '!he approved preli1n:inary plan included I:uildin3' plans iran the <br /> previously constJ:ucte:i units with minor changes noted. '!he <br /> revised bJilding plans incorporate all of the specific changes <br /> ~u~ for the 2 unit structure. Finish, trilll ani colors will <br /> be identical to existin3' units. <br /> 4. Revisions have been made to the location of trees as recommended <br /> in the Preli1n:inary Plan review. Trees proposed along the east <br /> side of the bJildin3' should be plante:! west of the top of the berm <br /> due to the location of the sewer line inside the property line. <br /> Although specific varieties of shrub species is not indicated, the <br /> range of species indicate:! for each size groupin3' allows for some <br /> flexibility . <br /> The amount of the Lan:lscape Performance Bond will be set by staff <br /> ani IlII.ISt be provided by the Applicant prior to issuance of a <br /> Building Permit. <br /> 5. Negotiations for the sale of this property by the City, resulted <br /> in a price that includes a value for park dedication. . <br />