My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-15-1993
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1993
>
CCP 06-15-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:28 PM
Creation date
11/6/2006 2:57:17 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. total number of spaces in a project does <br /> not meet the required number of spaces, <br /> the applicant shall show to the city's <br /> satisfaction that the peak parking load <br /> will not exceed the number provided. <br /> Such reduction in parking may limit the <br /> type of future occupants or may require <br /> expansion of parking if the parking need <br /> increases. Combined or joint parking <br /> shall be reasonably related to the <br /> destination of the user. <br />(h) Traffic impact study. The city has <br /> determined that the traffic capacity of the <br /> interchange at I-35W and State Highway 96 <br /> will impose limitations on traffic generated <br /> within the GB District. In order to maintain <br /> the functional capacity of the area road <br /> system, both internal and external traffic <br /> and parking plans and traffic generation <br /> studies prepared by registered traffic <br /> engineers will be required for all projects <br /> within the GB District. <br /> During the project and site plan review <br /> process, the city will review a project plan <br />. or site plan and determine the allowable <br /> development intensity based on the following <br /> guidelines: <br /> 1- Improvements to the I-35W ramp <br /> intersections with Highway 96 and the <br /> realignment and intersection <br /> improvements of Round Lake Road West as <br /> it intersects with Highway 96 will allow <br /> development in the GB District that will <br /> produce a maximum total of one thousand <br /> five hundred (1,500) outbound peak p.m. <br /> traffic-hour trips. <br /> 2. A roadway along the southerly border of <br /> the GB District that would connect Round <br /> Lake Road West with Old Highway 10 would <br /> allow additional development that would <br /> produce up to fifty (50) additional <br /> outbound peak p.m. traffic-hour trips. <br /> 3. A bridge across I-35W at approximately <br /> 14th Street that would connect Round <br /> Lake Road West with C.S.A.H. 77 in New <br />. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.