Laserfiche WebLink
<br /> COUNTY ROAD I RECONSTRUCTION <br /> I IIAHLINE AVENUE TO TRUNK !D:GBVAY 49 <br /> PROPOSED PROJECT <br /> . ~e segment of County Road I between aamline Avenue and Trunk Highway 49 is proposed to be <br /> reconstructed to an urban type section with storm sewer, curb, and gutter. The road would <br /> be 52 feet wide at the intersections of Ramline Avenue, Lexington Avenue, and Trunk Highway <br /> 49 utilizing a four lane design consisting of four 12 foot travel lanes and two feet of <br /> curb and gutter. The 52 foot section would taper to a 40 foot section beyond the major <br /> intersections. The 40 foot design would consist of two 12 foot travel lanes and two eight <br /> foot shoulders consisting of six feet of b1tWllinous and two feet of curb and gutter. An <br /> eight foot bitWllinous path is proposed for the north side of County Road I between Snelling <br /> Avenue and Lexington Avenue. Retaining walls may be required at some locations on the north <br /> side of County Road I to accommodate roadway construction. Parking would be prohibited. <br /> NEED <br /> The surface of County Road I from Hamline Avenue to Trunk aighway 49 is eroded, cracked, <br /> and patched. The base and sub-base are .'inadequate for current traffic conditions. The <br /> existing road width and travel lane provisions are not. in accordance \lith accepted <br /> standards. There are drainage problems on some sections of the road. There are limited <br /> - bicycle and pedestrian facilities located on this portion of County Road I. <br /> COSTS <br /> The estimated cost for the reconstruction of County Road I from aamline Avenue to Trunk <br /> aighway 49 is $2,830,400. Ramsey County funds will pay for approximately 80% of the total <br /> reconstruction cost. Assessments to benefiting property owners for non-roadway work will <br /> be determined in accordance with the assessment policies of the cities of Arden Hills and <br /> eShoreview when construction plans are complete. <br /> RIGIrr OF IfAY <br /> No additional permanent right of \lay will need to be acquired for the reconstruction of <br /> County Road I from Hamline Avenue to Trunk Highway 49. <br /> PUBUC INVOLVEMENT <br /> An informational meeting on this project has been scheduled from 5:00 to 7:00 p.m. on <br /> Tuesday, June 22, at the Turtle Lake School Cafeteria, 1141 North County Road I. Meetings <br /> have been held with City staff about the project. <br /> IHPLElIENTATION <br /> The reconstr.ction of County Road I could begin in 1994 if all required approvals for the <br /> project are received on schedule. <br /> ADDITIONAL INFORMATION <br /> For additional information about the reconstruction of County Road I, contact Kathy <br /> Roettger, Projec.t Manager, Ramsey County Public Vorks Department,. 3377 North Rice Street, <br /> Shoreview, MN 55126, telephone 484-9104. <br /> TAM <br /> . <br />