Laserfiche WebLink
<br /> , <br /> FINAL PAYMENT ESTIMATE <br /> NO. 3 IFlNAI.l . <br /> FROM: DECEMBeR 10. 1992 <br /> TO: JULY 16. 1993 <br /> CONTRACTOR: MACHTEMES CONSTRUCTION. INC. <br /> ADDRESS: P.O. BOX 727. ST. BONIFAClUS. MN 66376 <br /> OWNER: CITY OF ARDEN Hll.I.S <br /> PROJECT: KIETHSON AREA POND AND STORM SEWER IMPROVEMENTS (620-029) <br /> COMPI.ET10N DATE AMOUNT OF CONTRACT <br /> ORIGINAl.: ORIGINAL: $ 34.614.00 <br /> REVISED: REVISED: <br /> -- <br /> SCHEDULE 1,0 POND AND STORM SEWER IMPROVEMENTS <br /> 1 CLEARING AND GRUBBING LS 1 2000.00 0 0.00 1 2000.00 <br /> 2 COMMON EXCAVATION CY 693 6.00 0 0.00 720 3800.00 <br /> 3 CONNECT TO EX. 16" STORM EA 1 260.00 0 0.00 1 260.. <br /> 4 16" RCP, CLASS III LF 18 22.00 0 0.00 18 362. <br /> 5 24" RCP, CLASS III LF 392 32.50 0 0.00 397 12902.50 <br /> . 8 18" RCP FLARED END, CL. III EA 1 300.00 0 0.00 0 0.00 <br /> 7 24" RCP FLARED END, CL. III EA 2 350.00 0 0.00 2 700.00 <br /> 8 TRASH GUARD FOR 24" FLARED END EA 1 800.00 0 0.00 2 1200.00 <br /> 9 BAFFLED WIER IN POND LS 1 1260.00 0 0.00 1 1250.00 <br /> 10 48" DIA. MANHOLE EA 4 1000.00 0 0.00 4 4000.00 <br /> 11 MANHOLE EXTRA DEPTH (OVER 8') LF 8.8 70.00 0 0.00 9 630.00 <br /> 12 RIP RAP CLASS IV SY 121 8.00 0 0.00 829 3774.00 <br /> 13 SILT FENCE LF 300 1.76 0 0.00 0 0.00 <br /> 14 HAY BALES EA 20 4.00 0 0.00 0 0.00 <br /> 16 SEEDING AC 1 860.00 1 860.00 1 650.00 <br /> 18 WOOD FIBER BLANKET SY 800 4.00 0 0.00 0 0.00 <br /> 17 SODDING SY 2000 1.86 1600 2980.00 1600 2980.00 <br /> T SCHEDULE 1.0 POND AND STORM SewER IMPROVEMENTS-TOTAL $3.810.00 $34,288.60 <br /> . <br />