My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-29-1993
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1993
>
CCP 11-29-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:35 PM
Creation date
11/6/2006 3:05:17 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> --- --- --.------- <br />. DATE: November 22, 1993 <br /> PROJECT: Refurbishing Fernwood Street Water Tower <br /> OWNER: City of Arden Hills <br /> CONTRACTOR: Odland Protective Coatings, Inc. <br /> Tentative list of items to be completed or corrected by the Contractor: <br /> . Repair damaged bituminous curbing at the southeast corner of the water <br /> tower site. <br /> . Fill ruts and seed areas disturbed during the project. <br /> . Maintain seeded areas for 30 growing days. <br /> . Repair/replace door hinges. <br /> . Install dry tube lighting fixtures (2) . <br /> . Remove debris from overflow screen. <br /> . Provide electrical inspection for electrical work completed under this <br /> contract. <br /> The first three items shall be completed by May 31, 1994. The remaining <br /> items shall be completed by December 31, 1993. <br />. <br />. <br /> 027-2410.nov <br />
The URL can be used to link to this page
Your browser does not support the video tag.