Laserfiche WebLink
<br /> --- --- --.------- <br />. DATE: November 22, 1993 <br /> PROJECT: Refurbishing Fernwood Street Water Tower <br /> OWNER: City of Arden Hills <br /> CONTRACTOR: Odland Protective Coatings, Inc. <br /> Tentative list of items to be completed or corrected by the Contractor: <br /> . Repair damaged bituminous curbing at the southeast corner of the water <br /> tower site. <br /> . Fill ruts and seed areas disturbed during the project. <br /> . Maintain seeded areas for 30 growing days. <br /> . Repair/replace door hinges. <br /> . Install dry tube lighting fixtures (2) . <br /> . Remove debris from overflow screen. <br /> . Provide electrical inspection for electrical work completed under this <br /> contract. <br /> The first three items shall be completed by May 31, 1994. The remaining <br /> items shall be completed by December 31, 1993. <br />. <br />. <br /> 027-2410.nov <br />