Laserfiche WebLink
<br /> , . <br /> COUNTY ROAD F <br /> Estimated Reconstruction Costs <br /> City of Arden Hills, Minnesota <br /> . Unit Extended <br /> llirnl QuantitY !.!nit ~ Clm <br /> Street Reconstruction <br /> Remove Existing Bituminous 20.000 SY $2.00 $40,000 <br /> Remove Existing Dm Aprons 600 SF $2.25 $1,350 <br /> Common Excavation 14,356 CY $5.50 $78,956 <br /> Common Borrow 10,767 CY $7.50 $80.750 <br /> Subgrade Preparation 50 STA $120.00 $6,000 <br /> Class 5 Aggregate 10,197 TN $6.50 $66,278 <br /> Bituminous Base Course 3,234 TN $21.00 $67,922 <br /> Bituminous Wear Course 3,234 TN $23.00 $74,391 <br /> Bituminous Tack Coat 1,000 GAL $1.30 $1,300 <br /> PCC Sidewalk 31,000 SF $3.20 $99,200 <br /> PCC DfIN Apron 600 SY $21.00 $12,600 <br /> ACC DfIN Apron 300 SY $6.00 $1,800 <br /> B618 Curb and Gutter 10,500 IF $6.00 $63,000 <br /> Concrete Valley Gutter 600 SF $6.50 $3,900 <br /> Triangular Valley Gutter 6 EA $375.00 $2,250 <br /> Sod 1,200 SY $2.00 $2.400 <br /> Seed 2 AC $1,500.00 $2,280 <br /> Testing 25 EA $75.00 $1 875 <br /> . $606,251 <br /> StanT! Sewer Construction <br /> 15" RCP 600 IF $18.00 $10,800 <br /> 18" RCP 1,500 IF $21.00 $31,500 <br /> 24" RCP 700 IF $27.00 $18,900 <br /> 30" RCP 1,200 IF $36.00 $43,200 <br /> 18" FES 1 EA $125.00 $125 <br /> 24" FES 1 EA $200.00 $200 <br /> 30" FES 1 EA $250.00 $250 <br /> Standard Manhole 4 EA $950.00 $3,800 <br /> Standard Catch Basin 24 EA $850.00 $20.400 <br /> Rip Rap 20 CY $50.00 $1,000 <br /> Granular Foundation 1,333 CY $4.00 $5,333 <br /> In-Place Density 2 EA $75.00 lliQ <br /> $135,658 <br /> Street Reconstruction Costs $606,251 <br /> Storm Drainage Improvement Costs $135658 <br /> Total Construction Cost $741,910 <br /> Estimated Overhead Cost $237411 <br /> . Estimated Total Project Cost $979,321 <br />