Laserfiche WebLink
<br />-~- <br /> <br /> <br />. . <br /> <br /> <br /> <br /> <br /> <br />Appropriation of Public Walen · end details with flared end sections and rip rap <br />. (energy dissipaters). <br />Permit approval is required for the appropriation of water · size and description of sttUcture. <br />from: · emergency overflow elevation and route. <br />B. ConstnJdion schedule. <br />1. A public water basin or wetland wholly witliin C. NlUTative describing consttUction methods. <br />Hennepin or Ramsey County which is less than 500 D. Erosion-Sediment Conltol Plan (see below). <br />acres in surface area. E. Compuaations of watershed area. peak flow rates, <br />2. A protected waterCourse which bas a drainage area and discussion of potential effects on water levels <br />of less than 50 square miles. above and below the project area. <br /> <br />Applicants requesting approval to appropriate from public Roul!h Grtulinl! Pl4n <br />waters must complete an Appropriation Checklist (avail- <br />able from the RCWD Office). Rougb Grading Plans are issued to regulate earthwork on <br />sites which will eventuaIlyrequire either a Land Develop- <br />Bridge or Culvert ConstructWn and Repair ment Plan or FmaJ Site Drainage Plan, but for which <br />development plans have not been finalized. ConsttUction <br />Bridge or culvert consttUction and repair require pennit of impervious surfaces or sttUctures is not generally a1- .. <br />approval. lowed with this permit. <br /> <br />Necessary exhibits to accompany the application include: Necessary exhibits include: <br /> <br />A. Conslruction details showing A. Grading and Erosion-Sediment Conltol Plan (see <br />· existing and proposed flowline (invert) eleva- below). <br />tions. B. Delineation of any ditches, floodplain, and wetland <br />areas. <br /> <br /> <br />. ..',','....,..','...'.~.'..."..'.',.,',',','.,',',......,.','...."','...,.',.,.,,,',',','.w.'....,',',....'.'.'...',.....,...,',..','..,','",',',',..,'.',',..,........"..,'.'",'.,.'...'....",..'.'..,'.,.w..,'..,...,.,'.w......,.,'".'.'.'...,.'.'.'.'....,','.'.........'.'...'.w......................,,'..,.N.....'..,...,.....'.'.'..',.,........'.'...'......'..,..'...'.',',........,,'.'.'...'.'.',.,','.'........'.........'...w....'.....'.'...,.,~~i <br /> <br /> <br />Storm water Manal!ement Plan Grtulinl! and Erosion-Sediment Control Plan h <br />-:". <br /> <br />Stormwater Management Plans must address the quan- 1. Existing and proposed topographic map showing ;jl <br />tity and quality of runoff affecting a site. The following all property under conltol of the applicant. ~~: <br />information must be shown: 2. Delineation of any ditches, floodplain, and wet- ~~i <br />lands within the project area. r <br />1. Documentation of ltibutary and on-site drainage 3. Minimum floor elevations for structures. ::, <br />areas for existing and proposed conditions. 4. Emergency overflow elevations and routes. ~~; <br />2. Calculations demonstrating the peak nIDoff rates 5. Proposed land use pIan showing roads. buildings, t <br />from the site are not increased due to the project. parking lots. :11: <br />Rate conltol is required for both the I- and 100- 6. Existing and proposed drainage features and el- :~1~ <br />year critical events. Plans should label normal, evations. f <br />1-, and Ioo-year pond elevations. 7. Copy of MPCA notification for project with over ~::: <br />3. Delineation of any ditches, floodplain, and wet- 5 acres of graded area. ~[~ <br />land areas within the project area. 8. Documenaationofconstructionphasingandimple- I <br />4. Narrative describing adequacy of drainage routes mentation plan. ~ij <br />downstream of project. . 9. Phone number and address of person responsible r <br />5. Computation of any floodplain storage losses. for erosion conltol. '~1: <br />6. Details of outlet structures showing elevation, use 10. Plan showing temporary and pennanent erosion ~t <br />of a baffled weir/skimmer at pond outlets, and control features designed to prevent erosion and fi' <br />sufficient permanent pool volume to meet Disltict contain sediment onsite. Measures include silt :;~ <br />requirements. fence. sediment basins, mulches, turf establish. ,::: <br />ment, and outfall stabilization. ;i: <br />. II. Schedule of anticipated construction sequencing. !!~ <br /> <br /> <br /> <br /> <br />3 <br />