Laserfiche WebLink
<br /> . Average Daily Flow = 300,000 gpd <br /> Peak Flow Rate = 1,000 gpm <br /> As previously mentioned, the existing wastewater pumping system (main lift station and off-site <br /> forcemains) is outmoded, expensive to operate, and in need of replacement. In recognition of <br /> these facts, the U.S. Army commissioned a study of alternative discharge locations that could <br /> receive the wastewater flow from TCAAP. The findings of this study are summarized below. <br /> AT.):'F.RNATlVR DISCHARGE I.OCATJONS <br /> MWCC Facilities <br /> MWCC staff identified a 66-inch diameter gravity interceptor (4-NS-523), Lift Station L-35, and <br /> a 24-inch diameter gravity interceptor in Arden Hills as potential alternative discharge locations <br /> (see attached exhibit). The MWCC 4-NS-523 gravity interceptor conveys the wastewater flow <br /> from approximately 50% of Mounds View, as well as the communities upstream of Mounds View. <br /> It has adequate capacity to convey TCAAP's "modified caretaker" status wastewater flow. <br /> t <br /> MWCC Lift Station L-35 is located west of U.S. Highway 10 along County Road H. It <br /> discharges via a 24-inch forcemain to the MWCC 4-NS-S23 gravity interceptor jyst west of;lIie ~_ <br /> Fridley/Mounds View corporate boundary. Lift Station L-35 serves the remaining 50% of.-;' --. <br /> . Mounds View. The lift station was over-sized when it was constructed in 1965 to provide - <br /> sufficient capacity to convey TCAAP's wastewater flow. The lift station has a firm pumping - <br /> capacity of approximately 4,400 gpm. Mounds View's peak flow into the lift station is only 1,600 <br /> gpm. Consequently, the lift station has reserve capacity (2,800 gpm) well in excess of TCAAP's <br /> "modified caretaker" status peak flow rate of 1,000 gpm. <br /> The MWCC 24-inch gravity interceptor near 1-694 was also investigated as an alternative <br /> discharge location. However, it was learned that the MWCC has planned for years that TCAAP's <br /> wastewater flow should be conveyed to Lift Station L-35 for pumping to the 4-NS-523 gravity ~ <br /> in terceptor. Also, it was learned from MWCC staff that the reserve capacity of the 24-inch <br /> gravity interceptor was marginal to convey TCAAP's wastewater flow. <br /> City of Mounds View Facilities <br /> Research of Mounds View facilities revealed that the City has a 21-inch gravity line along County <br /> Road H that has adequate capacity to convey TCAAP's "modified caretaker" status peak flow rate <br /> of 1,000 gpm to.the MWCC's Lift Station L-35. Because only 3/4 ofa mile of gravity interceptor <br /> would be necessary to connect TCAAP's main lift station to the Mounds View 21-inch gravity <br /> line, this alternative was selected for implementation. <br /> City of Arden Hills Facilities <br /> . Research of Arden Hills' facilities identified an I8-inch gravity line that is tributary to the <br /> MWCC's 24-inch gravity interceptor. However, this alternative discharge location was rejected <br /> for the following reasons: <br /> 049.220J.feb S20-049-70 <br />