Laserfiche WebLink
<br />. CJ:'lY OF ARDEN BILlS <br /> MIiMJRl\NDllM <br /> DATE: April 25, 1994 <br /> 'ltl: Dorothy A. Persc:n, City ~nmini strator <br /> FRQ!: Cindy Severtson, Parks &: Recreati.a1 Director C/5 <br /> SUBJECT : 1994 Diseased Tree Rem:Jval Prices <br /> As you are aware, only one bid was received for the renoval of <br /> diseased trees this year. The bid was received fran Precision Tree. <br /> It was considerably higher than the 1993 prices. <br /> In an attenpt to receive lower prices, Gary Arpa was contacted to <br /> suhnit a price quote. The quote obtained fran Arpa Tree Service was <br /> lower than Precision Tree. I reccmnend that the bid fran Precision <br /> Tree be rejected and the price quote fran Arpa Tree Service be <br /> accepted for the 1994 diseased tree renoval. <br /> The following is a reflection (based on the 1993 number of trees <br /> rerroved.) of the price difference between Precision Tree and Arps Tree <br /> Service <br />. Precision 1994 bid - Tree Onlv <br /> $ 9. 50 x 72 = $ 684.00 <br /> $10.25 x 43 = $ 440.75 <br /> $13 .75 x 13 = $ 178.75 <br /> $18.50 x 4 = S 74:00 <br /> $1,377.50 <br /> Woodpile rerroval $40.00 per cubic yard <br /> Brush rerroval $800.00 per twenty yard load. <br /> Ar9s Tree Service - Tree 0n1,y <br /> $ 8.00 x 72 = $ 576.00 <br /> $10.00 x 43 = $ 430.00 <br /> $15.00 x 13 = $ 195.00 <br /> $20.00 x 4 = S 80.00 <br /> $1,281. 00 <br /> Woodpile renoval $30.00 per cubic yard <br /> Brush rerroval $300.00 per twenty yard load. <br /> Arps Tree Service w:>uld be required to sign a contract in order to <br /> caq;Jly with rell'Oval deadlines. <br />. CS:rk <br />