Laserfiche WebLink
<br /> ARDEN HILLS CITY COUNCIL - JULY 11, 1994 8 <br /> . Mr. Solar stated that the other choice would be to allow 10 feet on one side for parking and <br /> 4 feet on the other side. <br /> Severtson stated that the 10 feet on one side for parking would be preferable because there is <br /> a fair amount of pedestrian traffic along that road. Several residents have expressed concern <br /> about the fact that County Road E is seen as a four-lane road and pedestrians are not given <br /> the right-of-way at all. <br /> Mr. Solar stated that could be done. The only trouble with making a wider shoulder on one <br /> side is that there will be drivers who try to use the parking lane as a driving lane. <br /> Hicks noted the two driveways at the intersection of T .H. 51 and County Road E. Cars <br /> could turn left into the first driveway without trouble but not the second one. <br /> Mr. Solar stated that there should be medians at that intersection. If the bridge is rebuilt, <br /> there will be a concrete island all the way through. Islands are typically used to protect <br /> signalized intersections. <br /> Hicks recommended that this plan be sent to the Public Safety Committee for review. <br /> Mr. Solar stated that he would like to receive direction from Arden Hills for the restriping <br /> . project. <br /> Malone asked how late in the season striping can be done. <br /> Mr. Solar answered, until late October. The County will have to request that the state <br /> approve the work. He would like to see it done by late August or September. <br /> Malone stated that the City can respond after the Public Safety Committee meeting by the <br /> first Council meeting in August. <br /> REVIEW OF 1994 PAVEMENT MANAGEMENT SCHEDULE <br /> Winkel referred Councilmembers to the 1994 pavement management schedule in the Council <br /> packet. He reported that the work will begin Monday, July 18, 1994, to remove the <br /> blacktop from Dunlap and storm sewer work will begin Tuesday, July 19. The Bussard <br /> Court reconstruction will start soon after. The Keithson Road cold-in-place recycling and <br /> Amble Drive reconstruction projects will begin towards the end of July or the first part of <br /> August. NSP will be moving the gas main on Amble Drive, and this work should be <br /> completed within a couple of weeks. <br /> . <br />