My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-21-1994
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1994
>
CCP 09-21-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:58 PM
Creation date
11/6/2006 3:35:32 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> V. possible Solutions Costs <br /> New City Hall facilities are estimated to cost in the range <br /> of $80-100 per square foot for totally new facilities. Retrofit <br /> of the existing building is estimated at $40-60 per square foot <br /> of the existing building plus the added cost of adding onto the <br /> existing building to provide the total facilities needed. <br /> New Public Works facilities are estimated at $60-80 per square <br /> foot. Again the cost of retrofit would be $40-60 per square foot <br /> plUS the new costs for added facilities. <br /> Expansion and retrofit of both buildings, on the present site, <br /> would cause serious crowding of the site and cause future problems. <br /> Estimated square foot costs shown herein are based on today's <br /> cost and must be revised to relate to the anticipated construction <br /> time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.