My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-10-1994
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1994
>
CCP 10-10-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:01 PM
Creation date
11/6/2006 3:35:46 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> CITY OF ARDEN HILLS <br /> . MEMJRANOOM <br /> DATE: October 6, 1994 <br /> TO: Dorothy Person, City Administrator <br /> FRCM: Dan Winkel, Public W:)rks Superinteodent JJ, W . <br /> SUBJECT : Update on 1994 Pavement MaIla.gE!m5!llt l?roj acts <br /> Due to the recent wet weather the prc:gress on the 1994 pavement <br /> projects has slowed a bit. The current activity on all of the <br /> reconstruction streets is sed and black dirt restoration. It is <br /> anticipated that the sod =rk will te done by the end of next week. <br /> All of the iron (rranholes and gate valves) have teen raised in <br /> preparation for the final lift of blacktop. The final lift will te <br /> ccmpleted after all other restoration items have been done. <br /> . Staff has also had a few driveway issues that needed to te taken care <br /> of. Due to the changes made in the grade of the new streets, a number <br /> of driveways have a steeper slope =tpared to tefore the project. 'TIle <br /> norrral slope of a driveway is not to exceed eight to thirteen percent. <br /> Changes have been rrade to reduce the grade to meet specifications. <br /> The contract lists Octol:er 15 as the corrpletion date for all work on <br /> the 1994 projects. At this time. I do not telieve that all work will <br /> be ccmpleted prior to that date. should the projects not be corrplete <br /> by October 15 the contractor will be subjecl: to pay $300 dollars for <br /> each consecutive calendar day until final completion of the job. <br /> I will continue to m::>nitor the prc:gress and keep you informed. <br /> m:jt <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.