Laserfiche WebLink
<br /> .. CITY OF ARDEN HILLS <br /> MI!H:lRANDllM <br /> DATE : NaII~ 3, 1994 <br /> TO: Mayor a:cd City ...."'......,n <br /> FRCH: CiDiy S. walsh C5 ~ <br /> stlBJEC'l': McD.thly Report <br /> Park ~;nt.t?.nan~~ Proiect:s <br /> The rrajor rraintenance and re=nst:ruction projects at Valentine Park <br /> have been carpleted. Items in need of finishing touches include, <br /> leveling and domant seeding of the area around the parking lot, <br /> painting of the wanning shelter, installing the parking lot light pole <br /> (NSP) and placing =crete b..mp=l between the parking lot and <br /> basketball oourt. These will be carpleted by NoveItU:Jer 11 weather <br /> pennitting . We will also plan to clean out the ditch along Cblmty <br /> Road F, which will ensure proper draiIJage next spring. 'I1le Valentine <br /> . Park parking lot has been const:ructed to allow water to drain into the <br /> culvert l=ated in the NorthEast comer of the park. <br /> The rraintenance ~ will be preparing for Winter by taking in the <br /> tennis nets, cleaning leaves on the tennis oourts, servicing <br /> equiprent, installing the winter banners. <br /> Recent V;onri;o 1 ism in our Parks <br /> The telephone lines which are l=ated on the outside of the shelters <br /> at Hazelnut and Omrnings Parks have been severed and pulled out of <br /> their box. I am ha~g them installed on the inside of the wanning <br /> shelters, which is the way they should have been done originally. <br /> Vandals also broke into Peny Park and destroyed the t:hernostat on the <br /> heater . The case covering the heater was srrashed as well. 'I1le <br /> existing heaters at Peny Park are old and inefficient. I am lcoking <br /> into the cost of repair VB. replacerrent. <br /> . <br /> ------- <br />