Laserfiche WebLink
<br /> ----------------- <br /> the FerIThKX'ld Ave. water tower. The contractor for the restoration . <br /> project, an Engineer fran M.S.A. and our staff people visually <br /> inspected the tower. The tower appears to be in good shape, with no <br /> visible signs of a problem. A follow-up inspection should be done in <br /> tw::l to three years. <br /> Yesterday, I met with Chuck Janski fran M.S.A. to discuss an <br /> evaluation of the Arden Hills sanitaI)' sewer system. The intent of <br /> the study will be to help with the formation of a long term <br /> maintenance and capital replacerrent program. Lift station needs will <br /> also be reviewed. Cur P. W. staff will be available to assist with <br /> this study during the winter rronths. <br /> Shoreview is still reviewing the need to reconstruct County Road I <br /> from Lexington to Hamline. The Public Works Director indicated to me <br /> that sare Council members are interested in this project so that the <br /> trail and/or bike path system can be connected together bet....:en parks. <br /> It should also be noted that Ramsey County is planning to reconstruct <br /> County Road I bet....:en Hamline and 35W in 1996 or 1997. It appears to <br /> me at this ~int, that the entire length of County Road I from 35W to <br /> Lexington Ave. will probably be done in 1996 or 1997. . <br /> . <br />