My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-28-1994
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1994
>
CCP 12-28-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:11 PM
Creation date
11/6/2006 3:44:47 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> CITY OF ARDEN HILLS <br /> . <br /> MEl'IDRANOOM <br /> DATE : December 23, 1994 <br /> - <br /> TO: Mayor & Council <br /> FRCM: Dan winkel, Public Works Superintendent \:NJ <br /> SUBJECI' : Replacement of Booster Staticn and Fernwcod Avecue Water <br /> Tower Control Panels. <br /> The electrical control panels at the l:xxJster station and Fe:rm.o:d <br /> Avenue water tower are in need of replacement due to the age and the <br /> inability to get parts for roth. Both panels have teen in place since <br /> the late 1960's. <br /> The 1994 Capital Equipment budget has $15,000 allocated for the <br /> replacement of these panels. Additional electrical and TlOtor <br /> replacement work will be budgeted for in 1996. <br /> . Staff wrote specifications and solicited quotations for this project. <br /> The specifications were written so that a non-proprietary system could <br /> be installed. A benefit of a non-proprietary system is that <br /> replacement equipment is available from multiple vendors, rather than <br /> sourced from a single rranufacturer. TIle arrrent panels are roth <br /> proprietary systems that require spare parts from one manufacturer. <br /> Some of the parts are OCM obsolete and cannot be replaced. <br /> Quotations were received from Auto Con Industries, and Connelly <br /> Industrial Electronics. Aid Electric was mailed the specifications but <br /> did not bid on the project. The quotations are as follaws: <br /> Connelly Indlqtrial Electronics - Replacement of l:xxJster station and <br /> Femw::x::d Avenue water tower controls, $13, 856 . 82 . <br /> AutoCon Inr111qtries - Replacement of l:xxJster station, Fe:rm.o:d Avenue <br /> water tower controls, and also work at the Roseville Booster Station, <br /> $16,357.00. <br /> The work at the Roseville Booster Station does not have to be <br /> ccmpleted nON. The intent is to do the work at the Roseville site, <br /> . replace existing lON efficiency TlOtors, and install a "soft-start" <br /> - ------ <br />
The URL can be used to link to this page
Your browser does not support the video tag.