My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-28-1994
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1994
>
CCP 12-28-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:11 PM
Creation date
11/6/2006 3:44:47 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> II CITY OF ARDEN HILLS <br /> MEMJRl\NDllM <br /> DATE: December 23, 1994 <br /> - <br /> TO: Mayor & Co1=il <br /> FRa.!: Dan Winkel, Public Works Superintendent \hJ <br /> SUB.:JECT : Replacement of Booster Station and Fe%IllIolOOCl Avenue Water <br /> Tower Control Panels. <br /> The electrical =trol panels at the b:oster station and Fernwood <br /> Avenue water tower are in need of replacement due to the age and the <br /> inability to get parts for J::oth. Both panels have been in place since <br /> the late 1960's. <br /> The 1994 Capital Equiprent budget has $15,000 allocated for the <br /> replacement of these panels. Additional electrical and rrotor <br /> replacement MJrk will be budgeted f= in 1996. <br /> ~ Staff wrote specifications and solicited quotations for this project. <br /> The specifications were written so that a non-proprietary system could <br /> be installed. A benefit of a non-proprietary system is that <br /> replacement equiprent is available fran multiple vendors, rather than <br /> sourced from a single manufacturer. The ==t panels are J::oth <br /> proprietary systems that require spare parts from one manufacturer. <br /> Sc:me of the parts are TJfJoN obsolete and cannot I::e replaced. <br /> Quotations were received fran Auto Con Industries, and Connelly <br /> Industrial Electronics. Aid Electric was mailed the specifications but <br /> did not bid on the project. The quotations are as follows: <br /> Connelly Inrnlstrial Electronics - Replacement of booster station and <br /> Fernwood Avenue water tower controls, $13,856.82. <br /> AutoCon Innll"tries - Replacerrent of b:oster station, Fernwood Avenue <br /> water tower =ntrols, and also MJrk at the Roseville B=ster Station, <br /> $16,357.00. <br /> The MJrk at the Roseville B=ster Station does not have to be <br /> completed TJfJoN. The intent is to do the 1I.Ork at the Rcseville site, <br /> . replace existing low efficiency rrotors, and install a "soft-start" <br />
The URL can be used to link to this page
Your browser does not support the video tag.