My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-09-1995
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1995
>
CCP 01-09-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:12 PM
Creation date
11/6/2006 4:15:44 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I, \ <br />I. rnernorand urn <br />. <br />. TO: Terry Maurer <br />I FROM: Tom Roushar~ <br />I SUBJECT: Preliminary Plans Titled "Minnesota Army National Guard, Utility System <br /> Conversion, New Brighton, MN", Melchert/Block Associates, (MBA) <br /> December 1994 <br />. DATE: January 3, 1995 <br />. FILE: 520-053-11 <br /> This review of the preliminary plans is based on the assumption that the City of Arden Hills <br />. will assume ownership of the sanitary and water facilities after they have been constructed. <br /> Review comments will be presented on a sheet-by-sheet basis followed by a general overview. <br />.. SHEET NO.1 <br /> 1. The note "Connect New 10" Watermain to Existing 6" Water Line" is in error. <br />I <br /> 2. The 4" 0 forcemain and 10" 0 watermain are shown in a single 30" 0 casing. <br />. Replacement of either of these lines in the future will be difficult. Separate casings or <br /> a larger single casing (assuming that the Minnesota Department of Health will approve) <br /> should be provided. <br />. 3. The proposed alignment for the 30" 0 casing will have a major impact on the Hamline <br /> Avenue/Minnesota Trunk Highway 96 intersection during construction. Alternative <br />. alignments to permit crossing of MTH 96 either east or west of the intersection should <br /> be evaluated. <br />. 4. A 10" 0 watermain is proposed. I have serious reservations that a long 10" 0 dead- <br /> end can provide the required fire flow unless the National Guard buildings have fire <br />. sprinkler systems. <br /> SHEET NO.2 <br />. 1. The proposed lift station location is a poor location for Arden Hills to provide future <br />.. maintenance. A better location would be in the Hamline Avenue right-of-way or just <br /> off the right-of-way. Under this scenario, a gravity line would be extended from the <br /> proposed lift station location out to Hamline Avenue. That portion of the gravity line <br /> off City right-of-way should remain the property of the National Guard and be treated <br />. as a long sewer service. <br /> 520/0534.105 .jan <br />
The URL can be used to link to this page
Your browser does not support the video tag.