My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-27-1995
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1995
>
CCP 02-27-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:15 PM
Creation date
11/6/2006 4:15:53 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> - ---- <br />------- <br /> . <br />Jal1uary 3, [995 . <br />Mr, Winkel e. <br />Page 2 <br />south of the COMF connection manhole, This connection scenario would be the least expensive I <br />alternative for the MNARNG and is therefore the preferred connection, <br />The proposed water connection is located in the SW Quadrant of Ham line and 96, A ten (10) inch . <br />watermain would be installed to serve the COMF, <br />As a part of this formal request there are three drawings which show the proposed service . <br />connections to The City of Arden Hills utility systems, The sewer connection includes option A and <br />B, Option A. the preferred option, requires repumping of the COMF wastewater, Option B <br />discharges to a manhole which is the beginning of a gravity system, . <br />Based on a meeting held on December 20, 1994 at the TCAAP which was attended by representatives <br />of MNARNG, MBA. The City of Arden Hills and Ramsey County there are plans for future I <br />development of City and/or County facilities north of Highway 96, The City and County may, in <br />conjunction with the MNARNG project, want to oversize utility services to serve more than just the <br />COMF, The MNARNG will cooperate in a joint project whereby the City and/or County would pay . <br />for the oversizing of services, The cost of oversizing could be established through the bidding <br />process, <br />It is the MNARNG's desire to complete the connection to the City of Arden Hills utility systems by el <br />July I, 1995, It is therefore necessary for the City/County to provide sufficient information to the <br />MNARNG's consultant, MBA. so that alternative designs can be compler ,;; and bidding documents . <br />can be prepared, <br />Very truly yours, I <br />~?y-- . <br />William R, Block, PE I <br />MelchertlBlock Associates Inc, <br />mb I <br />xc: Wade Scepurek, Camp Ripley <br /> I <br /> I <br /> el <br /> . <br />~--- <br />
The URL can be used to link to this page
Your browser does not support the video tag.