Laserfiche WebLink
<br /> , .., I <br />:::a <br />:::a I <br />=a TABLE C-l -I <br />=- <br />:a PRELIMINARY COST ESTIMATE I <br />::a NEW WATER AND SANITARY SEWER SYSTEMS <br /> CONNECI'lON TO mE CITY OF ARDEN HILLS I <br />=- <br />:::t WATER <br /> ,i I <br />:J <br /> 715 LF 10" DIP @ $24/LF = $ 17,160 <br />:J 680 LF 12" DIP @ $28/LF = 19,040 I <br /> 2 EA 10" GATE VALVES @ $600 EA = 1,200 <br />::) 2 EA 12" GATE VALVES @ $750 EA = 1,500 <br />::) 150 LF JACKING (HWY 96) @ $150 LF = 22,500 . <br /> 1 CONNECTION TO EXISTING HYDRANT @ LS = 500 <br />:) 1 CONNECTION TO 12" TEE @ LS = 500 <br /> 1 CAP EXISTING 6" DIP @ LS = 500 I <br />:J 1 MISCELLANEOUS FITTINGS @ LS = 1.500 <br />~ TOTAL WATER $ 64,400 .1 <br />'" <br />. <br />'II SEWER I <br />.. <br />, 1 LIFr STATION W/CONTROLS @ LS $ 16,000 <br />~ = <br /> 1,310 LF 4" DIP FM @ $9/LF = 11,790 I <br />. <br />. 50 LF JACKING (HAMUNE) @ $75/LF = 3,750 <br />) 1 CONNECTION TO EXIST MH #2 = 500 <br /> 1 CONNECTION TO EXIST MH #2 (AH) = 500 I <br />t 1 MISCELLANEOUS FITTINGS = 500 <br /> TOTAL SEWER $ 33,040 I <br /> COMBINED WATER AND SEWER $ 97,440 I <br /> CONTINGENCY - 15 PERCENT 14,616 <br /> TOTAL ESTIMATED CONSTRUCTION COST $112,056 <br /> ENGINEERING/SURVEYING (15%) 16,800 I <br /> ADMINISTRATIVE (5%) 5,600 <br /> TOTAL PROJECT COST (EST,) $134,456 I <br /> 16 e. <br /> I <br />