Laserfiche WebLink
<br />I <br /> . <br />I MS <br /> March 9, 1995 <br />I File: 52()..()55-1O <br /> fD~SULmG ENGlNEEIIS <br />I 1326 Energy Pork Drive Honorable Mayor and City Council <br /> City of Arden Hills <br /> 51. Pcul, MN 55108 1450 West Highway 96 <br />I 612-6.!4-4389 Arden Hills, MN 55112 <br /> 1-800-888-2923 <br /> Fox: 612-64-4-9446 RE: 1995 STREET MAINTENANCE IMPROVEMENTS <br />I <br /> Dear Mayor and Council: <br />I Attached is a copy of the Feasibility Study for the referenced project for your review. As <br /> desired by the City, the report includes not only the seal coat and maintenance <br />I improvements for 1995, but also the proposed reconstruction of Stowe Avenue. The street <br /> maintenance (seal coat and overlay) portions of the project include a sufficient number of <br /> streets to allow for the possible deletions of streets which may result from the public <br />I hearing process. <br /> CIVil ENGINEERING. The Feasibility Study proposes an informational hearing on April 3, 1995, to meet with <br />_RONMENTAl residents of those streets affected by the project. Also included in this packet are two <br /> IClPAl proposed Council Resolutions. Resolution 95-20 is provided for the Council to receive the <br /> ~LANNING feasibility study and to order a public hearing to be scheduled on April 10, 1995, following <br />I SOLID WASTE the proposed informational hearing. Resolution 95-21 orders MSA, Consulting Engineers <br /> STRUCTURAl to prepare plans and specifications for the project. <br /> SURVEVING <br />I TRAffiC I spoke with Mr. Tim Maesich of Ramsey County on Thursday, March 9, 1995, regarding <br /> ,RANSPORT ATlON the turnback of Stowe Avenue. I will be meeting with Mr. Maesich on Tuesday, <br />I ELEGRICAL!MECHANICAl March 14, 1995, to finalize the Stowe Avenue tumback issue. We anticipate that issue can <br /> ENGINEERING. be resolved to allow construction of Stowe Avenue in accordance with the schedule outlined <br /> HVA( within the enclosed report. <br />I POWER DISTRIBUTlCN <br /> SCADA We hope this letter adequately addresses any concerns or questions you may have regarding <br /> SYSTEM CONTROLS the referenced project. I will be present at the March 13, 1995, City Council meeting to <br />I address any additional questions or concerns you may have. <br /> Sincerely, <br />I <br />I <br />~ICESIN: <br /> MINNEAPOLIS <br /> PRIOR LAKE GIS:tw <br />I S1. PAUL Attachments <br /> 055-0903 .mar <br /> WASECA <br />