My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-13-1995
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1995
>
CCP 03-13-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:16 PM
Creation date
11/6/2006 4:15:59 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I ) " <br />~. CITY OF ARDEN HILLS <br /> MEMORANDUM <br />I <br /> DATE: March 10, 1995 <br />I TO: Brian Fritsinger, City Administrator <br />I FROM: Cindy S. Walsh, Parks and Recreation Director tS ~ <br /> SUBJECT: Parking Easement at Cuinmings Park <br />I Background <br />I At the time Cummings Park was developed, a parking lot for park users was not constructed. A <br /> lease agreement for parking space was drafted and signed with Control Data Corporation. This <br /> lease provided the City of Arden Hills with a parking lot for park users. The lease agreement <br />I was set up with the option of extending the term of this lease agreement for two successive <br /> periods of one year each. This lease was apparently extended for the two years. However, the <br /> lease agreement expired in 1985. <br />I Short and Long Term Parkinl,1 Options <br />II During the meeting with lames Belland and Walt Seiler from Control Data Systems, Inc. and <br /> yourself on Friday, March 3, 1995, it is apparent that both a short term agreement and long term <br /> solutions are necessary for parking at Cummings Park. Control Data Systems, Inc. seems very <br />I willing to work with the City to accommodate our needs. From our meeting on March 3, we <br /> agreed that the best short-term solution is to sign a temporary lease extension agreement for the <br /> use of their north parking lot. (Labeled Lot #1 on the Subdivision Plan enclosure). I have <br />I enclosed a copy of the lease extension agreement which would provide the City with parking <br /> through December 31,1995_ <br />I . After the lease agreement expires in December, Mr. Belland and Mr. Seiler suggested that <br /> Control Data may be interested in deeding the area they own at the northwest corner of their <br /> property to the City. Arden Hills could then construct our own parking lot. This area is labeled <br />I Lot #2 on the Subdivision Plan enclosure. <br /> Recommendations <br />I I recommend that the lease extension agreement prepared by Control Data Systems, Inc. be <br /> signed as a temporary solution to the City's parking needs. <br />I In order to solve the long term need for the users of Cummings Park to have parking, I <br /> recommend that you and I meet with Mr. Bellandi and Mr_ Seiler to consider their offer to <br />I possibility deed property to the City. As we discussed on March 3, some allowances may need <br /> to be made for the amount of green space Control Data is required to have. The deeding of this <br />I- property to the City would mean that this area would have to be cleared; thus, causing Control <br /> Data to lose some of their required green space_ As we also discussed, this area is close to the <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.