My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-16-1995
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1995
>
CCP 03-16-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:17 PM
Creation date
11/6/2006 4:16:03 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I <br /> I <br /> I <br /> f:DNSI!L TING ENGINEERS <br /> I March 17, 1995 Mi.1P 21 '.'9[; <br /> 1326 Energy Park Drive File: 520-055-10 .' I" ,'_',1 _~ ;I:j,,_,:, <br /> 51. Paul, MN 55108 <br /> . 612-6444389 <br /> 1-800-888-2923 <br /> Fax: 612-644-9446 Mr. Brian Fritsinger <br /> I City of Arden Hills <br /> 1450 West Highway 96 <br /> I Arden Hills, MN 55112 <br /> RE: MUNICIPAL STATE AID AND <br /> . RAMSEY COUNTY TURNBACK ISSUES <br /> Dear Mr. Fritsinger: <br /> . This letter was prepared to address several issues concerning the referenced subjects. The <br /> CIVIL ENGINEERIN&. first of which is the turnback of Stowe A venue. As noted at Monday night's City Council <br /> ._IRONMENTAL meeting, I met with Mr. Tim Mayasich of Ramsey County Public Works on Tuesday, <br /> NIClPAl March 14, 1995. As a result of that meeting, the enclosed sample resolution is submitted <br /> PlANNING for your consideration. As indicated in the feasibility study for the reconstruction of Stowe <br /> . SOLID WASTE Avenue, Ramsey County has proposed to use Option #2 for the turnback, resulting in the <br /> STRUCTURAL anticipated 100% funding of County eligible funds for that portion of the project. That <br /> SURVEYING amount is estimated at approximately $100,000, but may vary slightly based upon bids <br /> . TRAFFIC received and actual construction costs. More importantly, the project can proceed this <br /> TRANSPORTATION summer as outlined in that report. <br /> I ElECTRICAl/MECHANICAL The second issue is the County's desire to have maintenance and construction responsibility <br /> ENGINEERING: <br /> HVAC for Hamline Avenue from Floral Drive to T.H. 96, and West County Road F from <br /> I POWER DISTRIBUTION Hamline Avenue to Lexington Avenue, turned back to the County from the City of Arden <br /> SCADA Hills. As it has been proposed to seal coat Hamline A venue, we recommend deleting that <br /> SYSTEM CONTROLS portion of the 1995 Street Maintenance project at a potential savings to the City of <br /> I approximatley $22,000 to $25,000. <br /> Finally, upon resolution of these issues, we need to finalize the designation of Municipal <br /> I State Aid Streets for the City by May 1, 1995. This is typically required prior to March 1; <br /> however, the County has provided the MnDOT State Aid office with a list of all proposed <br /> turnbacks in the County to delay that reporting date until May 1. <br /> . <br /> .FICES IN: <br /> I MINNEAPOliS <br /> PRIOR LAKE <br /> . 51. PAUL <br /> WASECA <br />
The URL can be used to link to this page
Your browser does not support the video tag.