My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-27-1995
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1995
>
CCP 03-27-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:17 PM
Creation date
11/6/2006 4:16:07 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I. AJWEN HgJ.S CITY COUNCIL - MARCH 13. 1995 2 <br />. <br />I CONSENT CALENDAR <br />. A. Approve Claims and Payroll. <br /> MOTION: Malone moved and Hicks seconded a motion to approve the Consent Calendar as <br />. presented, and authorize execution of all necessary documents contained therein. <br /> The motion carried unanimously (5-0). <br />I PUBLIC COMMENTS <br />. Mayor Probst invited the audience to address Council with any matters of concern during this <br /> portion of the meeting. <br />. Mr. Mark Chapin of 3947 Rolling Hills Road, indicated concern regarding the townhouse <br /> development. He thanked the City Council for the opportunity of the public hearing on March <br /> 27th. He reported that a committee called the "Neighbors of Valentine Hills" had been formed <br />I and a representative would be present at all future City Council meetings. <br />I. Mr. Craig Wilson of 1677 County Road F, indicated he had been present and spoke at the <br /> meeting February 27th, He stated that since that time he has spoke with Mr. Stonehouse, <br /> consulting engineer of the project, and looked at some alternatives for County Road F. He <br />I indicated he would like to see changes made to reduce the speed, make the road safer and save the <br /> mature trees which are located on the south side of the road. <br />I Consulting Engineer, Mr. Greg Stonehouse, indicated they are making every effort to save the <br /> trees in this specific area and other areas. <br />I UNFINISHED AND NEW BUSINESS <br /> PLANNING CASE #95-6: RAMADA SITE PLAN REVIEW <br />I City Administrator Fritsinger reviewed the planning case. He indicated the Site Plan review is <br /> being submitted by the applicant in two phases. Phase 1 will be for an exterior facelift of the <br />. building which will include a dark green roof facia and screening of the existing satellite dish and <br /> rooftop mechanical equipment. He indicated there will be some changes to the exterior of the <br /> building including a stucco-type finish. The brick building will remain intact with.new columns <br />. which will be bright white to offset the brick finish. He distributed a brochure with samples of <br /> the materials for Council review. Mr. Fritsinger noted the intent was to modernize the facility. <br />I He explained phase 2 would include other site changes such as landscaping and parking. He <br /> indicated the Planning Commission had recommended approval of the case with no changes and <br />.- minimal comments. <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.