Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
<br /> I <br /> I ' . <br /> . <br /> will be written down by each party's driver. The records of <br /> I out-going material will be maintained based upon tons as measured <br /> I by Ramsey County's loader operator and will be the basis for <br /> billing each Party. <br /> I EQUIPMENT RENTAL <br /> Specialty uses of equipment by Parties may be arranged for use at <br /> I the Parties' own site(s). Ramsey County will transport the screen <br /> I plant and will charge Parties the applicable labor and rental <br /> rates. Rental rate of screen equipment will be billed on actual <br /> I hours used as recorded on equipment hour meter. Rental or <br /> delivery of the screen plant shall be coordinated with Ramsey <br /> I County. <br /> I eINIMUM USE <br /> Each Party shall reclaim the amount of recycled material up to the <br /> I tonnage hauled in by the Party less volume loss due to screening. <br /> Each Party may release all or part of their material to another <br /> I Party at their discretion. <br /> ACCEPTABLE MATERIALS <br /> I Each Party will be responsible in its use of the project and will <br /> I only dump material conducive to the project. No hazardous <br /> material will be tolerated. The following materials are not <br /> , <br /> , <br /> I acceptable: rocks, organic material, leaves, contaminated soils, <br /> concrete, construction debris. <br /> I FEES <br /> I Ramsey County will charge fees to recoup all costs of the project. <br /> At the time of this agreement, fees to be charged to each <br /> . user <br /> I 9 <br /> I <br />