My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-06-1995
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1995
>
CCP 07-06-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:26 PM
Creation date
11/6/2006 4:24:27 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ----------- <br /> I <br /> . <br /> TECHNICAL REVIEW COMMITIEE (TRC) MEETING ., <br /> ARMYIEPAlMPCA/AWANT -, <br /> Tuesday, 6 JUJIll 1995- 9:00 A.M. <br /> Governmcm Conference Room - Bldg. IOS <br /> A copy of tile .tT"nti.nr.e list is anached. I <br /> 1. Oneninll Remarlcs , <br /> Many welcomed everyoDC. <br /> Review of Agenda & M;m"~ of Last TRC MeetiDg: I <br /> There were no additions or coue..-r:ions to last momb's mimI'''''. I <br /> 2. TCAAP 1RP Activities: <br /> a. Off- TCAAP GfOImrlwater SVllfem I <br /> L Ooerable Unit 1 I <br /> . CODTllinmentlProduction Well p".,fin.1 Desil!Il Reoon <br /> Teri Perry, Barr Engineering, said the repon bas been submi.lIed for concwrent review. -. <br /> This is a consistency item and the time allotted is 40 days but they would Iike a 32~y <br /> review as this is a critical path item. Dagmar said they will aim for that. but if they have a <br /> problem with completing their review within the 32~y time period, they will let Teri know. , <br /> . Off-Post Monit0rin2: Wells Cona:onl.1 Desil!Il <br /> Mark Ryan said this is Jl"""iing resolution of comm"lUS on the PerfOnTI.n"" Monitoring Plan I <br /> for OUI. On scbMl1le. <br /> . Alternate Water SUlllllv Plan & Desim - Reoon Preoararion I <br /> Mark said they have received. comm"11tS. Proposing a meeting on the 15th of June. This <br /> may be done as a conference call (following tile Periorm.rr,e Monitoring Plan conference <br /> call which is scheduled for 9:30 that day.) I <br /> . PGAC Facility ConstrUction <br /> T eri said they are still on schedule. Scheduled to start up final phase in September. I <br /> . Raw Waste Piueline Construction <br /> T eri said that constrUction of the pipeline is complete. Stteets have been restored. The . <br /> project is to be fln.li?M in about a week. or two - a month ahead of Sl'j:I..m'le. <br /> . Control Svstem Inte2ration/Well House Desil!Il , <br /> Teri said they are conTinning worlc: on the prefinal design repon. This is due Septelllber 8th, <br /> but they are anticipating it will be finished sooner. She probably can give us a fumer date -, <br /> by next month. <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.