My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-06-1995
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1995
>
CCP 07-06-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:26 PM
Creation date
11/6/2006 4:24:27 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I <br /> , <br />- <br /> TECHNICAL REVIEW COMMJ.ll1:.l:. (TRO MtJ:IlNG .1 <br /> ARMYIEPAlMPCAJ ALIlANT <br /> TUesday, 6 June 1995- 9:00 A.M. I <br /> Government Coufe.eacc Room - Bldg. 105 <br />A copy of the 31T"'1lfl~11f"" list is .~,.h..d. I <br />1. OoeniUlzRemarks I <br />Marty welcomed everyone. I <br />Review of Agenda & Mim1TM of Last TRC Meeting: <br />There were no additions or corrections to last month's minutes. I <br />2. TeAAP IRP Activities: I <br /> Off- TeAAP Gronndw"r.... $vm!m <br /> a. <br /> l. Ouerable Unit 1 I <br /> . Co~;nmemlProduction Wen Prefin~1 Desim Reoon <br />Teri Perry, Barr Engineering, said the repon has been subm;1TM for COIlCUIl'Cnt review. -I <br />This is a consistency item and the time allotted is 40 days but they would like a 32-day <br />review as chis is a critical path item. Dagmar said they will aim for that, but if they have a <br />problem with completing their review within the 32-day time period. they will let Ten know. I <br /> . Off-Post MonitoriJJlz Wens Conceoft1~1 Desim <br />Marl: Ryan said chis is P'""(H11g resolution of comments on the petfOTman"", Monitoring Plan I <br />for OUI. On scl1ed1J..le. <br /> . Alternate Water Suoolv Plan & Desim - Reoort Prenararion I <br />Mark said they have received comm"'ll'$, Proposing a meeting on the 15th of June. This <br />may be done as a conference call (following the Petform~nr.e Monitoring Plan conference <br />call which is scheduled for 9:30 that day.) I <br /> . PGAC Facility COlIStIUcrlon <br />Teri said they are still on schedule. Sclleduled to start up final phase in September. I <br /> . Raw Waste Pineline CoIlSttllCtion <br />T eri said that coDStl'UCtion of the pipeline is complete. StreetS have been restored. The I <br />project is to be tin~ li7M in about a week or two - a month ahead of scl1edule. <br /> . Control System Inte2rarion/Well House Desim I <br />T eri said they are conrirlll;11g worlc on the prefinal design report. This is due September 8th. <br />but they are anticipating it will be fiDished sooner. She probably can give us a fumer date .1 <br />by next month. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.