My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-11-1995
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1995
>
CCP 09-11-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:31 PM
Creation date
11/6/2006 4:31:26 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I ,I" l <br />I 'M8~ <br /> -Il I. <br />I ICUISlL TI~G ENGINEERS ~~~t:e~~~~;5 7 :~; 5 ,--. <br /> \~--~ c ...j::,. . <br />I 1326 Energy ParkDri", 'F" \l7 1995 <br /> St. Poul, MN 55108 0_( , <br /> 612.644.4389 Honorable Mayor and City Council Of; " : 'i- ~'.>,:.- ;~: I '" ;-;> <br />I City of Arden Hills <br /> ].800.888.2923 1450 West Highway 96 <br /> Fax: 612.644.9446 Arden Hills, MN 55112 <br />I RE: COUNTY ROAD F RECONSTRUCTION <br /> PARTIAL PAY ESTIMATE <br />I Dear Mayor and Council: <br />I Enclosed are three copies of Pay Estimate No.2 for the referenced project. Based upon <br /> the work completed as of August 31, 1996, the total amount of Pay Estimate NO.2 is <br />I $189,040,14. This pay estimate includes the final street grading and paving, as well as <br /> CIVIL ENGINEERING driveway restoration and concrete apron installation. <br /> ENVIRONMEST AL <br />I eMUN!(ipAc. It is recommended that retainage in the amount of $33,904.01 be withheld from the <br /> PLANNING Contractor's payment. This retainage includes an additional $15,000 to be withheld until <br /> SOUDWA$;-E insurance matters are resolved for several issues regarding the County Road F project. <br />I STRUCTURAL <br /> SURVEYiNG Based upon conversations with the Contractor on Wednesday, September 6, 1995, it <br /> nAfFlC appears that the three flooded basement claims were to be paid by the Contractor's <br />I T~ANSPCRT,"" TION insurance: however, it is unclear as to whether or not those checks have been written. <br /> Until the City is assured that these and the other two property claims are addressed, we feel <br /> ElECiR!CAl/MECFANiCAl it is important to retain this extra amount. <br />I ENG:~EERING: <br /> HVA( <br /> If this pay estimate meets with the Council's approval, it would be appropriate to make <br /> POwERDIS;RIBUTION <br /> SCAD'/', payment to Midwest Asphalt, Inc., in the amount of $155,136.13. Please contact our <br />I SYSTEM CONTRClS office if you have questions or require additional information regarding this project. <br />I Sincerely, <br /> MSA, CONSULTING ENGINEERS <br />I ~~ <br />I <br /> OfFICES IN: <br /> _ MINNEAPOLIS GJS:tw <br />I Enclosures <br /> PRIOR LAKE <br /> ST, PAUL 052-1708. sep <br />I WASECA <br /> An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.