Laserfiche WebLink
<br /> I i IS~ <br /> I~~ I .Sf:;) 1 Co, ;995 <br /> . C01SULTL\G K\GL\EER!l September 13, 1995 <br /> 1326 Energy Park Drive File: 520-061-30 <br /> I St. Paul, MN 55108 <br /> 612'64A.'389 <br /> . 1,800,888,2923 Honorable Mayor and City Council <br /> fox, 6 i 2,64A,94A6 City of Arden Hills <br /> 1450 West Highway 96 <br /> . Arden Hills, MN 55112-5794 <br /> RE: ARDEN MANOR WATERMAIN IMPROVEMENTS <br /> . EID OPENING <br /> Dear Mayor and Council: <br /> I The City of Arden Hills received bids for the referenced project on September 6, 1995, at <br /> City Hall. Enclosed is a tabulation of bids from the opening. <br /> I CIVil ENGiNEERING- <br /> ENVIRONMENTAL The City had received two bids by 10:30 a.m. The Contractors' proposals ranged from a <br /> MUNICIPAL low bid of $63,860.00 as submitted by Dave Perkins Contracting, Inc., to a high bid of <br /> I e::NN'NG $87,375.00 as submitted by Ro-So Contracting, Inc. <br /> saUD WASTE <br /> STRUC!1JR.A.l The two bids that are presented on the enclosed bid tabulation are summarized below: <br /> . SURVEYING <br /> TRAffiC CONTRACTOR BASE BID PROPOSAL <br /> TRANSPORTATION <br /> . ::LEGRICAl/MECHANICAl Dave Perkins Contracting, Inc., Ramsey, MN $63,860.00 <br /> ::NG;NEE~ING' <br /> I HI/AC Ro-So Contracting, Inc., Centerville, MN $87,735.00 <br /> poWER DISiRIBunCN <br /> SCADA Due to the short lead time allowed by the Army, no feasibility study was implemented for <br /> I SYSE~ CONTROLS this project. The Engineer's estimate, as prepared upon completion of the plans, was <br /> approximately $50,400.00 (total construction cost) and was detennined using the mean <br /> construction bids from 1995. The discrepency between the Engineer's Estimate and the bid <br /> I is primarily 'due to the short construction time allowed under the contract as the Army <br /> wishes to complete the work by October 1, 1995. The relative spread of contractor <br /> proposals was approximately $24,000 and the low bid was 27% higher than the Engineer's <br /> I estimate. <br /> The low bidder, Dave Perkins Contracting, Inc., is a responsible and competent contractor, <br /> . OfFICES iN, MSA recommends that they be awarded the contract for the Arden Manor Watennain <br /> MINNEAPOliS Improvements project. <br /> I_RIOR lAKE <br /> ST.PAlIl <br /> WASECA <br /> . <br />