Laserfiche WebLink
<br /> I PARTIAL PAYMENT ESTlMATE <br /> I. NO.1 <br /> FROM: AUGUST 1. 1995 <br /> TO: AUGUST 31, 1995 <br /> I <br /> CONTRACTOR: VALLEY PAVING. INC. <br /> ADDRESS: 4105 - 85TH AVENUE N.. BLOG. B. SUITE 202. BROOKLYN PARK. MN 55443 <br /> I OWNER: CITY OF ARDEN HillS, MINNESOTA <br /> PROJECT: 1995 STREET IMPROVEMENTS (520-055-30) <br /> I COMPLETION OA TE AMOUNT OF CONTRACT: <br /> ORIGINAL: OCTOBER 15. 1995 ORIGINAL $ 360,008.80 <br /> REVlseo: REVISED $ <br /> I il/TEM CONTRACT ITEMS THIS- PERIOD TOTAL TO OATE, <br /> MnOOT <br /> IIHO. HO; DESCRIPTION' UHIT CTY. UNIT CrY: AMOUNT CrY; AMOUNT <br /> PRICE <br /> SCHEDULE 1.0 STOwe AVENue <br /> I 1 2104.501 REMOVE RCP PIPE LF 20 17.00 26.00 442.00 26.00 442.00 <br /> 2 2104.501 REMove CMP PIPE LF 35 12.00 38.00 456.00 38.00 456.00 <br /> 3 2104.509 REMOVE MANHOLE EA 1 575.00 1.00 575.00 1.00 575.00 <br /> . 2105.501 COMMON EXCAVATION (P) CY 2050 6.00 300.00 1,800.00 300.00 1,800.00 <br /> I 5 2105.507 SUBGRAOE 2XCAVATION CY 600 4.50 0.00 0.00 0.00 0.00 <br /> 6 2105.522 SELECT GRANULAR BORROW - CV CY 600 9.50 0.00 0.00 0.00 0.00 <br /> 7 2'05.5 SUBGRAOEPREPARATION RDST A 13.2 165.00 0.00 0.00 0.00 0.00 <br /> I~ 2105.525 TOPSOIL BORROW - CV CY 450 13.00 0.00 0.00 0.00 0.00 <br /> 2211.501 AGGREGATE BASE - ClJI,SS SA TN 2300 7.00 219.07 1,533.49 219.07 1,533.49 <br /> 231.602 BITUMINOUS PATCHING SY 150 10.00 0.00 0.00 0.00 0.00 <br /> 11 2232.501 MILL BITUMINOUS SURFACE 5Y 'S 3.50 507.00 1,n4.50 507.00 1,n4.50 <br /> I 12 2341.508 TfPE 41A BITUMINOUS WEAR COURSE TN 520 21.50 111.00 2:386,50 111.00 2.386.50 <br /> 13 2340.514 TfPE 318 BITUMINOUS BASE COURSE TN 780 19.85 112.57 2,234.51 112.57 2,234.51 <br /> 14 331.601 2'" BITUMINOUS DRIVEWAY PAVEMENT SY 230 7.50 0.00 0.00 0.00 0.00 <br /> I 15 2357.502 BITUMINOUS FOR TACK COAT GAL 225 1.35 45.00 60.75 45.00 60.75 <br /> 16 2535.501 BITUMINOUS CURB LF 325 2.93- 0.00 0.00 0.00 0.00 <br /> 17 2521.501 4. CONCRETE WALK SF '0 2.30 0.00 0.00 0.00 0.00 <br /> 18 2531.501 8618 CONCRETE CURB & GUTTER LF 2880 5.70 0.00 0.00 0.00 0.00 <br /> I 19 2531.507 6. CONCRETE DRIVEWAY PAVEMENT SY 285 23.00 0.00 0.00 0.00 0.00 <br /> 20 2531.507 6. CONCRETE DRIVEWAY APRON SV 180 24.00 0.00 0.00 0.00 0.00 <br /> 21 563.602 INLET PROTECTION EA 12 45.00 0.00 0.00 0.00 0.00 <br /> 22 2575.505 SODDING. riPE LAWN & BOULEVARD SY 4170 1.45 0.00 0.00 0.00 0.00 <br /> I 23 2502.501 4" PERFORATED HOPE PIPE DRAIN WITH LF .00 7.50 0.00 0.00 0.00 0.00 <br /> riPE I GEOTEX11LE SOCK <br /> 2. 2506.509 DRAIN llLE CORE CONNECTIONS EA . 150.00 0.00 0.00 0.00 0.00 <br /> ..,' <br /> I 25 2501.567 30- RCP SAFETY APRON & GRATE EA 1 2,100.00 1.00 2,100.00 1.00 2,100.00 <br /> 26 2503.541 30" RCP PIPE CL JII, DESIGN 3006 LF 33 87.60 33.00 2.690,60 33.00 2.890.80 <br /> 27 2503.541 21. RCP PIPE CL JlI, DESIGN 3006 LF 614 39.20 515.00 24.108.00 615.00 24,108.00 <br /> 28 2.503.541 18- RCP PIPE CL III, DESIGN 3006 LF 991 24.75 986.00 24,403.50 966.00 24,403.50 <br /> I 29 2503.541 15. RCP PIPE CL Ill, DESIGN 3006 LF 260 22.70 215.00 4,860.50 215.00 4,860.50 <br /> 30 2503.541 12" RCP PIPE CL JIl, DESIGN 3006 LF 90 21.00 96.00 2,016.00 96.00 2.016.00 <br /> J1 2506.508 CONSTRUCT MANHOLE, STORM 48" DIA EA 5 9aO.OO 8.00 7.840.00 8.00 7,840.00 <br /> I 32 2506.508 CONSTRUCT BAFFLE MH. STORM 96. DIA. EA 1 6,350.00 1.00 6.350.00 1.00 6,350.00 <br /> 33 2506.509 CONSTRUCT CATCH BASIN, 24. x 36. EA 6 830.00 3.00 2.490.00 3.00 2,490.00 <br /> 3' 2506.522 ADJUST FRAME AND RING CASTING EA 6 175.00 0.00 0.00 0.00 0.00 <br /> . 2531.511 PEDESTRIAN RAMP EA 1 200.00 0.00 0,00 0.00 0.00 <br /> I 504.602 ADJUST HYDRANT AND VALVE SOX EA 2 445.00 0.00 0.00 0.00 0.00 <br /> 1520057#1 ,\lVK4 Page 1 520-055-]G <br />