My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-19-1995
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1995
>
CCP 10-19-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:35 PM
Creation date
11/6/2006 4:31:38 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . . . <br /> . CITY OF ARDEN HILLS <br /> .- MEMORANDUM <br /> DATE: October 11, 1995 <br /> . TO: Brian Fritsinger, City Administrator <br /> . FROM: Dwayne Stafford, Public Works Superintendent <br /> SUBJECT: Lift Station #6 Modification <br /> . Back!!:round <br /> . Lift Station #6 is a smaller unit located on the West Shore of Lake Johanna serving <br /> approximately 10 homes. Sewage from these homes run toward the lake into a gravity line <br /> which flows to this lift station. It is then pumped up hill to a higher gravity line in Lake Johanna <br /> . Boulevard. Station #6 is approximately 35 years old and was scheduled for modification in <br /> 1994. <br /> . Lift Station Evaluation <br /> At the request of staff Charles Janski from MSA consultants, along with two Public works staff <br /> members, toured and evaluated our lift stations. Mr. Janski then prepared a report on the <br /> .. conditions of the station, which is enclosed. The report recommends modifications to Lift <br /> Station #6 due to its age and safety factors. A preliminary cost estimate for the work to be done <br /> is $25,000.00. <br /> . Recommendation <br /> I Staff recommends to Council, approval ofMSA Consultants to prepare specifications and seek <br /> proposals to modify Lift Station #6. Staff also recommends paying for the modifications using <br /> the $30,000 currently in the 1995 budget which is set aside to update the lift station alarm <br /> I system. This would delay the alarm system update until 1996. See attached memo from Mr. <br /> Post. <br /> . DS\jt <br /> I <br /> I <br /> I <br /> .e <br /> I <br /> __n____ <br />
The URL can be used to link to this page
Your browser does not support the video tag.