My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-19-1995
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1995
>
CCP 10-19-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:35 PM
Creation date
11/6/2006 4:31:38 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> r . <br /> C. Build a new City Hall on a more accessible site and enlarge the Public Works on the . . <br /> present site by retrofitting and joining the two buildings to make only a Public Works . <br /> Facility <br /> . <br /> - <br /> All of these alternatives are beyond the scope of study by this Committee. <br /> It is therefore recommended that a qualified consultant be selected to do an in-depth study of I <br /> all questions and to make fmal recommendations to the City based on their comprehensive study <br /> of the problems at hand. . <br /> Possible Solutions Costs ....... <br /> New City Hall facilities are estimated to cost in the range of $80-100 per square foot for totally . <br /> new facilities, This translates to a $670,000 to $840,000 projeet for a new facility. Retrofit of <br /> the existing building is estimated at $40-60 per square foot of the existing building plus the . <br /> added cost of adding onto the e_xisting building to provide the total facilities needed. <br /> New Public Works facilities are estimated at $60-80 per square foot. Again, the cost of retrofit . <br /> would be $40-60 per square foot plus the new costs for added facilities. These costs translate <br /> to a $1.3 to $1.8 million project cost for a combination of new and remodeled facilities. . <br /> Expansion and retrofit of both buildings on the present site could cause serious crowding of the <br /> site, and. therefore future problems. -. <br /> Estimated square foot costs shown herein are based on today's cost and should be adjusted to <br /> reflect to the acrual anticipated time of construction. I <br /> Candidate Building Sites <br /> The City Planner provided the "Available Sites" diagram which follows. From the total of . <br /> thirteen candidate sites, the Committee reduced the list to the following four basic loeations: <br /> --.. . <br /> .. 0 Existing site (#2) <br /> 0 The Arsenal at Hamline and Highway 96 (#1) I <br /> 0 Lexington Fox (#11) <br /> 0 Gateway Business District (#5, 6 and 7) I <br /> Each site has advantages and disadvantages associated with its selection. Those sites which were I <br /> eliminated were considered to be undesirable either because of their remote locations or because <br /> City Hall was deemed to be an inappropriate use at a given location. . <br /> 10 e. <br /> II . <br /> ' I <br /> L-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.