<br /> I CONTRACT ITEMS THIS PERIOD TOTAL TO DATE
<br /> ,ITEM MnDOT
<br /> ,
<br /> I i NO. NO. OESCRJPnON UNIT QTY. ':,. UNIT ClTY. AMOUNT Q1Y~ AMOUNT
<br /> ,
<br /> . PRIce
<br /> SCHEDULE 11.D HAMUNE AVE SEAL COAT
<br /> I 1 BITUMINOUS MATERIAl, CRS-2 GAL 5140 0.82 0.00 0.00 5,800.00 ... 4,756.00
<br /> 2 FA-2. CL.A., DRESSER AGGREGATE TON 2eo 35,00 0.00 0,00 255,00 8,925.00
<br /> , PAVE. STRIP. -4" SOUO YELLOW LF 9025 0.14 8,140.00 1,139.60 8,140,00 1,139.60
<br /> I 4 PAVE, STRIP. - 4" INTERMITIENT YEl.LOW IF 9025 0,07 1,600.00 112.00 1.600.00 112.00
<br /> 5 PAVE. STRIP. - 4- saUD WHITE LF 9025 0.12 8,512.00 1,021.44 8,512.00 1,021.44
<br /> , LEFT TURN ARROW EA 20 35.00 16.00 560.00 16.00 560.00
<br /> 7 STOP BAR EA 2 100.00 0.00 0.00 0.00 0.00
<br /> I T SCHEDULE 11.0 HAMUNE AVE SEAL COAT-TOTAL 2,833,04 16,514.04
<br /> I SCHEDULE 12.0 ARDEN PLACE SEAl. COATING
<br /> 1 BITUMINOUS MATERIAL. CRSM2 GAL 925 0.82 0.00 0.00 870.00 713.40
<br /> 2 FA-2, CLe., AGGREGATE TON 44 12.85 0.00 0.00 38.00 488.30
<br /> I T SCHEDULE 12.0 ARDEN PLACE SEAL COATlNG-TOTAl 0.00 1,201.70
<br /> SCHEDULE 13.0 FOREST LANE SEAL COAT
<br /> 1 BllUMINOUS MATERIAL, CRs..2 GAL 750 0.82 0.00 0.00 700.00 574.00
<br /> I 2 FA~2. CLC.. AGGREGATE TON " 12.65 0.00 0.00 30.00 385.50
<br /> T SCHEDULE 13.a FOREST LANE SEAL COAT-TOTAL 0.00 959.50
<br /> I SCHEDULS 14.0 GLENAROEN RD, SEAL COAT
<br /> 1 BITUMINOUS MATERIAL,. CR5-2 GAL 1575 0.82 0.00 0.00 1,425.00 1,168.50
<br /> leT FA-2, Cl.C.. AGGREGATE TON 12 12.85 0.00 0.00 65.00 835.25
<br /> SCHEDULE 14.Q GLENARDEN RO. SEAL COAT-TOTAL 0.00 2.003.75
<br /> I SCHEDUlE 15.0 PRIOR AVE OVERLAY
<br /> 1 CRACK SEAL LF 420 0.78 0.00 0.00 214.00 166.92
<br /> 2 CUT & PATCH EXISTING BITUMINOUS SY 210 10.15 211.00 2.141.65 295.00 2,994.25
<br /> , TACK COAT GAL 210 1.00 200.00 200.00 200.00 200.00
<br /> I 4 BITUMINOUS VIlEAR COURSE, 2331 TYPE 41 iON 40S 2250 353.04 7,943.40 353.04 7,943-40
<br /> 5 MllUNG SY 1735 0.78 0.00 0,00 1,657.00 1,292.46
<br /> , ADJUST MANHOLE CASTING EA 2 105.00 3.00 315.00 3.00 315.00
<br /> 7 ADJUST GATE VALVE BOX EA 2 85.00 0.00 0.00 0.00 0.00
<br /> I T SCHEDULE 15.0 PRIOR AVE OVERLAY-TOTAL 10.600.05 12,912.03
<br /> I SCHEDULE 16.0 JERROLD AVE OVERLAY
<br /> 1 CRACK SEAL LF 500 0.18 0.00 0.00 705.00 549.90
<br /> 2 CUT & PATCH EXISTING 81TUMINOUS SY 290 10.15 0.00 0.00 144.00 1,461.60
<br /> , TACK COAT GAL 290 1.00 2BO.00 280.00 280.00 280.00
<br /> I 4 BITUMINOUS WEAR COURSE, 2331 TYPE 41 TON 555 22.50 472.84 10,638.90 472.84 10,638.90
<br /> 5 MILLING SY 2100 0.76 0.00 0.00 1,993.00 1,554_54
<br /> 6 ADJUST MANHOLE CASTING EA a 105.00 7.00 735.00 7.00 735.00
<br /> I 7 ADJUST GATE VALVE sox EA , a5.00 0.00 0.00 0.00 0.00
<br /> T SCHEDULE 16,0 JERROLC AVE OVERLA Y- TOTAL 11,653.90 15.219.94
<br /> I SCHEOULE 17.0 SHOREWOOD DR. OVERLAY
<br /> 1 CRACK SEAL LF 550 O.7B 0.00 0.00 501.00 390.78
<br /> . CUT & PATCH EXISTING BITUMINOUS SY 280 10.15 137.00 1.390.55 137.00 1,390.55
<br /> TACK COAT GAL 275 1.00 300.00 300.00 JOO.OO 300.00
<br /> I 4 BITUMINOUS WEAR COURSE, 2331 TYPE 41 TON 525 22.50 540,06 12,151.35 540.06 12,151.35
<br /> 5 MILLING SV 2500 1.00 140.00 140.00 140.00 140.00
<br /> I 520057#2.'M<4 Page 3 520-055'::'0
<br />
|