Laserfiche WebLink
<br /> - - -. <br /> ~ I <br /> IMSf .1 <br /> !! \ I <br /> 1\-.-1 <br /> ~ 1 ! I <br /> "i'f "'""",,,,.,,,,,,,,,d October 26, 1995 <br /> t1l'SIlTI~GlNmFJJlS File: 520,061-30 <br /> 1326t"'f~ M Drivt I <br /> St. Pa<A. /IN 55108 <br /> 612-644-4319 Honorable Mayor and City Council I <br /> ,-BOe-lOO-2m City of Arden Hills <br /> f",,612-64.4.9H6 1450 West Highway 96 <br /> Arden Hills, MN 55112 I <br /> RE: STORMW ATER DRAINAGE IMPROVEMENTS <br /> BID OPENING I <br /> Dear Council Members: I <br /> The City of Arden Hills received bids for the above referenced project at 11:00 a.m., on <br /> October 26, 1995, at City Hall. The contractors' proposals ranged from a low bid of I <br /> .;',1:( ! '~;J!~;U:;;i~J\..; $54,466.00 as submined by Jay Bros., Inc., to a high bid of $112,089 _25. A summary of <br /> :...';!~)'.....'~Nr;., the three lowest bids is provided below and a detailed unit price breakdown is enclosed <br /> 'Y'...lNt::li"A, with this Iener. -I <br /> ~l.ANl,L\(, <br /> :!_~ilC ';"';. :.1:: Contractor Base Bid Proposal <br /> }l~:.:cri.m....~ I <br /> :-,,~vt1N~ Jay Bros., Inc. $54,466.00 <br /> lflMfK: Ramsey, MN <br /> r~AN)II(;~! A nCN I <br /> Penn Contracting $72,490.50 <br /> m:::Hii~.h}M(C'~AfK^~ Centerville, MN <br /> ::~.:G;U:fQ:':'JC I <br /> ,1\,11.( H & M Asphalt, Inc. $98,105.50 <br /> "O'h,€~ Df)U,S.\.JTO~ Elk River, MN <br /> 'i._":DA I <br /> ~:VS,tr" r:1)M~~Ol~ The Engineer's Estimate, as prepared upon completion of the plans, was approximately <br /> $56,700 (total construction cost), The Engineer's Estimate for this work was determined I <br /> using the mean construction bids from 1995. The relative spread of contractor proposals <br /> was approximately $57,600 and the low bid was 4% lower than the Engineer's Estimate: <br /> The low bidder, Jay Brothers, Inc., has worked for MSA on numerous projects, including I <br /> various subcontracting jobs in Arden Hills. Jay Brothers has completed work within <br /> standards of the construction industry and has been a responsible and c.)mpetent I <br /> OFFICES IN, Contractor. Therefore, MSA recommends that they be awarded the contract for the <br /> ~NNEAPOUS StOlIDwater Drainage Improvements project. -. <br /> PRIOR IAKf <br /> SHAUL <br /> WASKA I <br /> S:wJOM.:l611.Dtl <br /> A" Fomd Onoortunitv Emolover <br /> ----- <br />