Laserfiche WebLink
<br /> II <br /> Ie TH 96 - Urban Design Enhancement Program - DRAFT <br /> August 7, 1995 <br /> Page 11 <br /> I Table 4 <br /> Corridor Enhancement Costs - High-Level Treatments <br /> I Concept Cost Estimate <br /> I No. Item Unit Quanl Unit Cost Amount <br /> I 1. Street Lights L.p. 70,400 $12.00 $844,800 <br /> 2. TraiVWalk Lights L.p. 0 $15.00 $0 <br /> I 3. Walkway L.F. 7,800 $15.00 $117,000 <br /> I 4. Trail L.p. 35,200 $15.00 $528,000 <br /> 5. Landscaping <br /> I 5.1 Boulevards L.F. 70,400 $6.00 $422,400 <br /> Ie 5.2 Medians L.p. 20,000 $6.00 $120,000 <br /> 6. Landscaping - Special Focal Areas Each 3 $15,000.00 $45,000 <br /> I 7. Rest Stops for Trail Each 4$18,000.00 $72,000 <br /> 8, Corridor Gateways Each 2 $70,000,00 $140,000 <br /> I <br /> 9. City Entry Signs Each 12 $15,000.00 $180,000 <br /> - 10. Special Feature Signs Each 8 .$.3,000.00 $24,000 <br /> , Corridor Total Enhancement Cost . $2,493,200., '100% <br /> Cost I L.F. of Roadway (Total Length = 35,200' or 9.67 miles) $71 <br /> - Trail, Walkway, and TraiVWalkway Lighting (2,3,;ind.4) $645,000 26% <br /> I Items Eligible for State Aid Funding (I, 5, arid 6) . . $1,432,200 57% <br /> Items not Eligible for State Aid Funding (7, 8, 9, and 10) $416,000 <br /> 17% <br /> I .' <br /> Ie - <br /> I <br /> ~;' <br />