My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-26-1995
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1995
>
CCP 12-26-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:10:46 PM
Creation date
11/6/2006 4:41:01 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I <br /> I INTRODUCTION <br /> , This feasibility study was prepared for the City of Arden Hills to address the 1996 Street and <br /> Utility Improvements Project, as authorized by City Council resolution adopted at the November <br /> I 13, 1995, City Council meeting. The feasibility study addresses the reconstruction, bituminous <br /> overlayment, or routine maintenance (seal coating) of various streets within the City. The report <br /> is a preliminary investigation into two alternatives for the maintenance and reconstruction of <br /> I various streets within Arden Hills, as outlined in the City's pavement management program. <br /> Those streets proposed for reconstruction, bituminous overlayment, or seal coat maintenance are <br /> presented below and shown on Exhibits 1 and 2. <br /> I The streets were selected for analysis and consideration based upon a combination of issues. <br /> Those issues include the streets' Pavement Condition Index, cost of improvements, City funds <br /> I available, and geographic proximity. Two alternates for overlayment/reconstruction have been <br /> prepared with Alternate No. 1 streets being the top priority and Alternate NO.2 streets being <br /> considered as second priority improvements. Both alternates are presented below. Streets <br /> I proposed to be seal coated are the same under both alternates. Based upon the revised street <br /> improvements planning process, streets will be selected for improvements from the lists presented <br /> I following an informational gathering process in January. Following informational hearings, a <br /> revised feasibility study will be presented to the Council and a public hearing will be held to <br /> proceed with the project. <br /> II Routine Maintenance <br /> I Street From To Length <br /> Seal Coat <br /> I Indian Oaks Court James Avenue Cul-de-sac 570 <br /> Indian Oaks Circle Hamline Avenue Cul-de-sac 170 <br /> I Royal Lane Norma Avenue West Floral Drive 1,015 <br /> Chatham Avenue County Road E-2 Cul-de-sac 4,695 <br /> I Chatham Court Chatham A venue Cul-de-sac 200 <br /> Chatham Circle Chatham A venue Cul-de-sac 85 <br /> I Lametti Lane Snelling Avenue Cul-de-sac 695 <br /> Lameui Circle Lametti Lane Cul-de-sac 180 <br /> I Fernwood Road Ingerson Road Carlton Road 350 <br /> Fernwood Court Ingerson Road Cul-de-sac 240 <br /> I Edgewater A venue Lexington A venue Dead end 870 <br /> , <br /> I FEAS-520.068 -1- 520-ll68-1O <br /> -.--- <br />
The URL can be used to link to this page
Your browser does not support the video tag.