Laserfiche WebLink
LOT 3BLOCK 1BUILDING 3202,000 SFLOT 4BLOCK 1BUILDING 4215,600 SFLOT 1BLOCK 1BUILDING 1202,000 SFLOT 2BLOCK 1BUILDING 2215,600 SFLOT 5BLOCK 1BUILDING 5137,000 SFSTORMWATER4.6 ACPARKINGPROVIDED:255 STALLSPARKINGPROVIDED:253 STALLSPARKINGPROVIDED:229 STALLSPARKINGPROVIDED:223 STALLSPARKINGPROVIDED:260 STALLSOUTDOOR STORAGE30,000 S.F.OUTDOOR STORAGE30,000 S.F.OUTDOOR STORAGE30,000 S.F.OUTDOOR STORAGE30,000 S.F.OUTDOOR STORAGE <br />22,000 S.F.PARKBUILDINGPARKING LOT30' UTILITYEASEMENTEXISTING 8" WATERMAIN(SHOREVIEW)EXISTING 9" SANITARYSEWER (SHOREVIEW)EXISTING 12" WATERMAININTERSTATE HIGHWAY 35-W <br />66' UTILITIES EASEMENTEXISTING ROAD STUBEXTEND ROADWAYBEYOND THIS POINTEXISTING CHAIN-LINK FENCE TO BESALVAGED AND REINSTALLED UPONCOMPLETION OF GRADING IN TEMP.CONSTRUCTION EASEMENT50' TEMP. CONSTRUCTION EASEMENTTEMPORARY CONSTRUCTIONEASEMENT ON OUTLOT CEXISTING 8" SANITARY SEWEREXISTING SANITARY MHTHUMB ROADTEMPORARY SEPTIC DRAIN FIELD SIZEDPER RAMSEY COUNTY AND MPCA DESIGNSTANDARDS. CONNECT TO SANITARYSEWER TO WEST IN FUTURE AND AT TIMEOF RAMSEY COUNTY PARK IMPROVEMENTS.REVISE BLDG FOOTPRINT AND PARKINGAS NECESSARY TO ACCOMMODATETEMPORARY SEPTICTCAAP BUSINESS PARK - SCHEMATIC SANITARY SEWER OPTION 2ARDEN HILLS, MINNESOTA