Contractor's Application for Payment <br />Owner's Project No.: <br />Engineer's Project No.: <br />Agency's Project No.: <br />1 From START to 05/31/24 <br />A C D E F F1 F2 G H I J K L <br />Item Quantity Units <br />Unit Price <br />($) <br />Value of Bid Item <br />(C X E) <br />($) <br />Quantity Previous <br />Estimate <br />Value Previous <br />Estimate <br />Estimated <br />Quantity <br />Incorporated in <br />the Work <br />Value of Work <br />Completed to Date <br />(E X G) <br />($) <br />1 1.00 LUMP SUM 116,000.00 116,000.00 - 0.75 87,000.00 87,000.00 75% 29,000.00 <br />2 26.00 EACH 650.00 16,900.00 - 22.00 14,300.00 14,300.00 85% 2,600.00 <br />3 26.00 EACH 320.00 8,320.00 - 22.00 7,040.00 7,040.00 85% 1,280.00 <br />4 0.07 ACRE 21,000.00 1,470.00 - 0.07 1,470.00 1,470.00 100% - <br />5 0.07 ACRE 21,000.00 1,470.00 - 0.07 1,470.00 1,470.00 100% - <br />6 80.00 EACH 140.00 11,200.00 - 20.00 2,800.00 2,800.00 25% 8,400.00 <br />7 4.00 EACH 495.00 1,980.00 - 4.00 1,980.00 1,980.00 100% - <br />8 5.00 EACH 250.00 1,250.00 - - - - 1,250.00 <br />9 1.00 EACH 800.00 800.00 - 1.00 800.00 800.00 100% - <br />10 17.00 EACH 230.00 3,910.00 - 7.00 1,610.00 1,610.00 41% 2,300.00 <br />11 4.00 EACH 53.00 212.00 - - - - 212.00 <br />12 2.00 EACH 950.00 1,900.00 - 2.00 1,900.00 1,900.00 100% - <br />13 1.00 EACH 685.00 685.00 - - - - 685.00 <br />14 4.00 EACH 53.00 212.00 - - - - 212.00 <br />15 4.00 EACH 270.00 1,080.00 - 4.00 1,080.00 1,080.00 100% - <br />16 180.00 LIN FT 3.50 630.00 - 182.00 637.00 637.00 101% (7.00) <br />17 536.00 LIN FT 2.00 1,072.00 - 104.00 208.00 208.00 19% 864.00 <br />18 671.00 LIN FT 15.00 10,065.00 - 671.00 10,065.00 10,065.00 100% - <br />19 139.00 LIN FT 22.00 3,058.00 - 51.00 1,122.00 1,122.00 37% 1,936.00 <br />20 1,002.00 LIN FT 3.50 3,507.00 - 717.00 2,509.50 2,509.50 72% 997.50 <br />21 2,894.00 LIN FT 5.80 16,785.20 - 1,436.00 8,328.80 8,328.80 50% 8,456.40 <br />22 250.00 SQ YD 8.00 2,000.00 - 260.00 2,080.00 2,080.00 104% (80.00) <br />23 18.00 SQ YD 15.00 270.00 - 18.00 270.00 270.00 100% - <br />24 10.00 SQ YD 10.00 100.00 - - - - 100.00 <br />25 4,565.00 SQ FT 0.70 3,195.50 - - - - 3,195.50 <br />26 1.00 EACH 500.00 500.00 - - - - 500.00 <br />27 140.00 LIN FT 17.00 2,380.00 - - - - 2,380.00 <br />28 170.00 CU YD 27.00 4,590.00 - - - - 4,590.00 <br />29 207.00 CU YD 29.00 6,003.00 - 84.00 2,436.00 2,436.00 41% 3,567.00 <br />30 77.00 CU YD 52.00 4,004.00 - - - - 4,004.00 <br />31 50.00 CU YD 19.00 950.00 - - - - 950.00 <br />32 207.00 CU YD 34.00 7,038.00 - 84.00 2,856.00 2,856.00 41% 4,182.00 <br />33 2,718.00 SQ YD 2.60 7,066.80 - 2,718.00 7,066.80 7,066.80 100% - <br />34 21,787.00 SQ YD 5.00 108,935.00 - 2,052.00 10,260.00 10,260.00 9% 98,675.00 <br />35 325.00 CU YD 15.00 4,875.00 - 372.04 5,580.60 5,580.60 114% (705.60) <br />36 24.00 HOUR 250.00 6,000.00 - 4.00 1,000.00 1,000.00 17% 5,000.00 <br />37 1,291.00 SQ YD 30.00 38,730.00 - - - - 38,730.00 <br />38 15,820.00 SQ YD 1.30 20,566.00 - - - - 20,566.00 <br />39 2,254.00 GAL 3.60 8,114.40 - - - - 8,114.40 <br />40 10.00 SQ YD 35.00 350.00 - - - - 350.00 <br />41 6,822.00 TON 98.00 668,556.00 - - - - 668,556.00 <br />42 1.00 EACH 1,280.00 1,280.00 - - - 1,280.00 <br />43 1.00 EACH 450.00 450.00 - 1.00 450.00 450.00 100% - <br />44 1.00 EACH 670.00 670.00 - - - - 670.00 <br />45 1.00 EACH 1,490.00 1,490.00 - - - - 1,490.00 <br />46 438.00 LIN FT 70.00 30,660.00 - 401.00 28,070.00 28,070.00 92% 2,590.00 <br />47 63.00 LIN FT 76.00 4,788.00 - - - - 4,788.00 <br />48 20.00 LIN FT 88.00 1,760.00 - 11.00 968.00 968.00 55% 792.00 <br />49 11.00 LIN FT 129.00 1,419.00 - - - - 1,419.00 <br />B <br />Original Contract <br />% of <br />Value of <br />Item <br /> (J / F) <br />(%) <br />Balance to Finish <br />(F - J) <br />($) <br />MOBILIZATION <br />CLEARING <br />Description <br />Work Completed <br />Materials Currently <br />Stored (not in G) <br />($) <br />Work <br />Completed <br />and Materials <br />Stored to Date <br />(H + I) <br />($) <br />Contract Information <br />Bid Item <br />No. <br />GRUBBING <br />CLEARING <br />REMOVE DRAINAGE STRUCTURE <br />REMOVE SIGN <br />SALVAGE GATE VALVE & BOX <br />SALVAGE PIPE APRON <br />SALVAGE SIGN <br />GRUBBING <br />REMOVE CASTING <br />REMOVE GATE VALVE & BOX <br />Application Date:Application Period:Application No.: <br />Engineer: <br />Contractor: <br />Project: <br />Contract: <br />Previous Estimate <br />05/31/24 <br />Progress Estimate - Unit Price Work <br />City of Arden Hills <br />Bolton & Menk, Inc. <br />S.M. Hentges & Sons, Inc. <br />2024 PMP Street & Utility Improvements <br />2024 PMP Street & Utility Improvements <br />Owner: <br />0T1.130168 <br />PW-24-0100 <br />REMOVE BITUMINOUS WALK <br />REMOVE SKIMMER WALL <br />GRADE CHANNEL <br />EXCAVATION - COMMON <br />EXCAVATION - SUBGRADE <br />REMOVE VALVE BOX <br />REMOVE HYDRANT <br />REMOVE CURB & GUTTER <br />REMOVE CURB & GUTTER (SPOT) <br />REMOVE CONCRETE DRIVEWAY PAVEMENT <br />REMOVE CONCRETE PAVEMENT <br />REMOVE BITUMINOUS DRIVEWAY PAVEMENT <br />SALVAGE MAILBOX SUPPORT <br />SAWING CONCRETE PAVEMENT (FULL DEPTH) <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />REMOVE WATERMAIN <br />REMOVE SEWER PIPE (STORM) <br />HAUL FULL DEPTH RECLAMATION <br />EXPLORATORY EXCAVATION <br />REMOVE AND PATCH BITUMINOUS PAVEMENT <br />MILL BITUMINOUS SURFACE (2.0") <br />BITUMINOUS MATERIAL FOR TACK COAT <br />SELECT GRANULAR EMBANKMENT <br />COMMON EMBANKMENT <br />STABILIZING AGGREGATE <br />GEOTEXTILE FABRIC TYPE 7 <br />FULL DEPTH RECLAMATION <br />TRASH GUARD FOR 36" SPAN PIPE APRON <br />12" RC PIPE SEWER <br />15" RC PIPE SEWER <br />18" RC PIPE SEWER <br />24" RC PIPE SEWER <br />TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) 3.0" THICK <br />TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) <br />12" RC PIPE APRON <br />INSTALL PIPE APRON <br />10" PVC PIPE APRON <br />Unit Price <br />EJCDC C-620 Contractor's Application for Payment <br />(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.1 of 3