Laserfiche WebLink
DESCRIPTION OF PROPERTY SURVEYED <br />(Per Warranty Deed Doc. Nos. A4551451 and T2512961) <br />Parcel I: <br />All of the Northwest one -quarter of the Northeast one quarter (NW 1/4 of NE 1/4) of Section 34, Township 30 North, Range 23 West, <br />except the following fl a described parcels: <br />A) The West one hundred twenty (W. 120) feet of the East three hundred forty-seven (E. 347) feet of the North two hundred eighty-three <br />(N. 283) feet the —Card <br />B) The North three hundred forty-three (N. 343) feet thereof lying West of a line, being a ontinuation of the Westerly line projected a <br />Southerly direction, of the West one hundred twenty (W. 120) feet of the East three hundred forty-seven (E. 347) feet of the North two a <br />III eighty-three (N. 283) feet of said NW 1/4 ofNE 1/4. <br />C) That port of the East 100 feet of the Northwest Quarter of the Northeast Quarter of Section 34, Township 30, Range 23 West, which lies <br />South of the extended South right-of-way line of Harriet Avenue as said line is shown in the plat of Hunter's Park Fourth Addition. <br />D) That port of the Northwest Quarter of the Northeast Quarter of Section 34. Township 30. Range 23. bounded by the fallowing described <br />line: <br />Beginning at a point on the East line of said Northwest Quarter of the Northeast Quarter. distant 1.395.75 feet Northerly from the Southeast <br />r of the Southwest Quarter of the Northeast Quarter of said Section 34. thence Westerly 70.00 feet at right angles to said East line: <br />thence Northerly. parallel with said West line to a line parallel with and distant 43.00 feet Southerly from the North line of said Northwest <br />Quarter of the Northeast Quarter; thence Easterly along last said parallel line to the East line of said Northwest Quarter of the Northeast <br />Quarter: thence Southerly along said East line to the point of beginning. <br />E) The East 347 feet of the North 343 feet of the Northwest Quarter of the Northeast Quarter (NW 1/4 of NE 1/4) of Section 34, Township <br />30, Range 23 a cording to the United States Government Survey thereof, Ramsey County, Minnesota; a cepting therefrom any part thereof <br />ontained in the deeded legal description to the City of Arden Hit in Warranty Deed dated April 3, 1978, filed April 25, 1978, as Document <br />No. 2000781 which deeded legal description is described as fall aws: <br />That part of the Northwest Quarter of the Northeast Quarter of Section 34, Township 30, Range 23, bounded by the following described line: <br />Beginning at a point on the East line of said Northwest Quarter of the Northeast Quarter, distant 1,395.75 feet Northerly from the Southeast <br />of the Southwest Quarter of the Northeast Quarter of said Section 34; thence Westerly 70.00 feet at right angles to said East line; <br />thence Northerly parallel with said East tine to a line parallel with and distant 43.00 feet Southerly from the North fine of said Northwest <br />Quarte'Nor <br />of the Northeast Quarter; thence Easterly aI.rq last said parallel line to the East fine of said Northwest Quarter of the Northeast <br />Quarter; thence Southerly along said East line to the point of beginning. <br />Subject to that part thereof taken for highway purposes by the State of Minnesota and fled for <br />record. <br />Ramsey County, Minnesota <br />Abstract Property <br />Parcel 2; <br />The Southwest Quarter of the Northeast Quarter of Section 34, Township 30, Range 23 West, a cept part taken for Josephine HMIs No. 3, and <br />Is'cept that part which lies Southerly and Easterly of a line described as follows: <br />Beginning at the most Northerly corner of Lot 1, Block 12, Josephine Hill. No. 3, thence North 61 degrees 12 mi <br />nute. 00 s ands East, 30 <br />feet; thence North 03 degrees, 04 minute. 20 s ands West, 84.83 feet; thence North 75 degrees 49 m nutes 18 s ands East 659.72 feet, <br />or less, to the East line of said SouthwestQuarterof the Northeast Quarter, and there terminating Subject to that part thereof taken <br />far highway purposes by the State of Minnesota and filed of record. <br />Tarrens Property <br />Tarrens Certifcate No. 598428 <br />TITLE COMMITMENT <br />This s rvey was prepared without the benefit of c ent title work. Easements, appurtenances, and anumbrances may <br />exlet n addition to those shown hereon. This survey is subject to revision upon receipt of a currenttitle insurance <br />commitment or attorney'. title opinion. <br />GENERAL NOTES <br />1.) Survey coordinate basis: Ramsey County Coordinate System <br />2.) East right-of-way line of State Trunk Highway 51 established using alignment provided by Minnesota <br />Department of Transportation. <br />3.) At the time fieldwork w s performed for this s rvey, there w significant a unt of sn n the <br />ground. Physical feature. r <br />s were located to the .best of o ability, but there may be additional <br />features that were not visibleand, therefore, not shown hereon. <br />4.) Bearings and/or dimensions listed within brackets are per plot or record documents. <br />5.) Wetlands shown hereon a e per a oft -site determination on the Figure 6 Exhibit as indicated in a <br />wetland report prepared by Pinnacle Engineering on January 24, 2020. <br />6.) There were n. wetland delineation markers observed in the process of conducting the feldw.rk. <br />UTILITY NOTES <br />1.) Utility inf.—H., from plans and markings w ve <br />. <br />ombi,ed with obserd evidence of utilities to <br />develop a vlof the underground utilities shownreo hen. However, lacking a va lion, the a act <br />tali., ofu nderg ...d features . rot be a urately, completely and reliably dad epicted. In dition, <br />Gopher State One Call locate requests from sa rveyars may be ignored a suit in omplete <br />response. Where additional o e detailed information is required, excavation and/or lac private <br />utility locate request may be eoessary. <br />2.) Other underground utilities of which we are unaware may exist. Verify all utilities critical to <br />construction or design. <br />3.) Some .nderg r.. nd utility locations o shown as marked —its by those utility companies whose <br />I...tare responded to our Gopher State One Coll, ticket numbers 200090758 and 200090762. <br />4.) Contact GOPHER STATE ONE CALL at 651-454-0002 (800-252-1166) for precise oneits location of <br />utilities prior to any excavation. <br />ZONING NOTES <br />1.) Zoning information obtained from the City of Arden Hills web site on February 5th, 2020. <br />The subject property is zoned: B-2- General Business District <br />Proposed zoning: ?????? <br />2.) The setbacks for zone B-2 are. <br />Building: Front yard = 20 feet <br />Side yard Interior (Principle) = 10-20 feet (Minimum total both yards on Lot) <br />Side yard Interior (Accessory) =10 feet <br />Side yard Corner = 20 feet <br />Rear yard = 20 feet (Principle) <br />Rear yard = 10 feet (Accessory) <br />Lot Coverage by Structure: 45% <br />Height : 50 feet <br />Min. londscdap. Lot area: 20% <br />3.) We have shown the current zoning cl ass if cation of the property. building setback requirements and <br />other Lot rbq.ir.m.rt.0 as at forth In that alassifaation based on our own research. <br />xN07E- <br />Minimum setback requirements are established by current ordinances. The location of setback lines is <br />subject to legal interpretatian and planning a ..iderations. therefore setback he or. ot shown. <br />Specific questions regarding setback requirements should be directed to the regulating authority. <br />AREAS <br />Lot = 278,757 square feet or 6.399 ac <br />Lot 2 = 161,282 square feet or 3.703 a <br />Lot 3 - 1, 392, 319 square feet or 31.963 ar s <br />fee, <br />Total = 1,884,438 square feet or 43.261 acres <br />OWNER DEVELOPER: <br />CIVIL ENGINEER: <br />Bethel University <br />BKBM <br />3900 Bethel Drive <br />6120 Earle Brown Drive, Suite 700 <br />St. Paul, MN <br />Minneapolis, MN 55430 <br />Contact person: Glenn Hofer <br />Contact person: Joel W. Maier P.E. <br />Phone: (651)-638-6069 <br />Phan e:(763)843-0420 <br />ARCHITECT/DESIGNER: <br />BUETOW 2 Architects, Inc. <br />SURVEYOR: <br />Sur& Lond Surveying, LTC <br />2905 Dean Parkway, Suite A <br />9001 E. Bloomington Freeway, Suite IIS <br />Minneapolis, MN 55416 <br />Bloomington, MN 55420 <br />Contact person: <br />Contact person: Airs, J. Carlson <br />Phone: (612)-455-2626 <br />Phone: (952)-881-2455 <br />hereby certify that this survey, elan, o report was <br />prepared by m under my direct supervision and <br />that a a duly Licensed Land Surveyor under the <br />laws of the State of Minnesota. <br />Dated this 5th day of February, 2020 <br />SONDE LAND SURVEYING, LLC. <br />BY -lee J. Carlson, P.L.S. Minn. Lio. No. 44900 <br />LL Removed proposed-1,fing and park;ng Lot JMD 04/07/202 <br />New Lot Lapul JMD 03/I]/202 <br />e ■ <br />Orvwmq Pw <br />PRELIMINARYPLAT OF.- <br />2 PINE TREE NORTH <br />SIsrnvEYINa z- ` °.e2� s . <br />LAND SURVI3YlATs ass�ra.:`ee-eee-sszei <br />