Laserfiche WebLink
D UTILITY - == <br />ENT I <br />i <br />I <br />� I <br />/y I <br />x <br />i <br />i <br />/ <br />11 <br />II <br />1 <br />D <br />z <br />m D <br />D C� <br />V) m <br />m <br />Et DZ <br />C 0 <br />Z <br />J <br />z <br />--- I Q <br />F- <br />LU <br />� <br />--- W <br />� 3 <br />I <br />U <br />li <br />II <br />II <br />I <br />I <br />I <br />I <br />1 <br />1 <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />� I <br />I ) <br />I � <br />I / <br />I <br />i <br />_.L._._ I <br />a I <br />sm - - - - - _ _ - - - - <br />_----- -------------Ti -II I F1 <br />.. <br />- .. <br />° <br />W HYDRANT o <br />2 1 6" GV W/ BOX <br />C5o2 C502 8" X 8" TEE <br />CBMH-3 <br />8 8" DIP WM <br />C502 <br />STMH-2 E <br />RIM: 928.64 C5 <br />INV: 924.27 <br />III <br />RIM: 927.42 C501 I -I I--I-I-I <br />INV: 922.91« <br />" CC 45° BEND( C502 272 LF 12" PVC (SCH. 40) @ 0.50% C502 45° BEN D (( <br />" _ 4°DT <br />r <br />14 LF 1 i�� <br />� RCP @ 0.50% <br />C502 <br />145°BEND I <br />I I _ I <br />I _ <br />Y I <br />152 LF 15" o. <br />I RCP @ 0.50%� <br />Y <br />45° BEND <br />RIM: 928.44 <br />INV: 924.34 <br />a <br />2 O_ op <br />C502 6" X 8"TEE <br />COORD. W/MECH. 6" FIRE SERVICE 6" GV W/ BOX <br />BRING 12" ABOVE FEE <br />PROVIDE BLIND FLANGE COORD. W/ MECH. <br />INV: 922.00 <br />10" RD. COORD. W/ MECH. <br />INV: 925.00 3" CU DOM. SERVICE <br />�I-I -I <br />I CBMH-4 ' _ z I <br />RIM: 927.52 tY <br />8 INV (E): 923.80 90° LONG SWEEP 2 3' X 8"TEE <br />C501 INV (N/S): 922.15 rsm 3" GV W/ BOX <br />SUMP: 918.15 <br />I 1 <br />29 LF 18" <br />RCP @ 0.5081 �� 11 90° LONG SWEEP <br />All <br />120 LF 10- PVC (SCH. 40) @ 1100 % COORD W/ MECH <br />q FES-1 ^ // <br />C501 INV: 922.00� INV:923.3 <br />it C502 g _ PROPOSED FIRE STATION <br />CO, TYP 3 FFE: 930.00 (ARCH: 100'-0") <br />DT INV: 920.67 B o <br />I 8 2 _ <br />C502 C502 � - <br />8 6"HYDRANT <br />6" GV W/ BOX <br />8"X6"TEE <br />I <br />p s s - <br />� I <br />Y <br />III I s s <br />45° BEND <br />C502 <br />Y <br />6"HYDRANT <br />6" GV W/ BO; <br />8'X6"TEE <br />8"X8"TEE <br />a 3 <br />I N <br />C502 <br />I <br />8"DIP WM <br />WET -TAP EXISTING WM <br />8" GV W/BOX <br />�) <br />_ I <br />100 LP g• <br />C602 <br />) C502 <br />PVC (sC-I) <br />H. 40) @ 1.975. ) ) <br />01 <br />92 LF8"PVC <br />(SCH. 40) @ 0.40% CONNECT TO EXISTING <br />SMH-1 18' RCP INV: 922.48' SANITARY MANHOLE <br />3 y 5 RIM: 928.00 8"PVC TOP: 921.86 INV: 920.86' <br />IN (W):921.33 <br />o _ C502 INV (E): 921.23 l �o'�' <br />ml <br />C503 <br />C502 CO, P <br />DT INV: 9 67 mg» <br />45' BEND I <br />I <br />7L <br />10" RD. COORD. IhiI <br />W/MECH. STMH-6 <br />INV: 925.00 C501 RIM: 926.90 <br />� <br />6 <br />\/ <br />C502 <br />INV: 923.66 <br />SUMP: 920.66 <br />I <br />�^ <br />C502 <br />27 LF 10" PVC (SCH. 40) @ 1.00% <br />I RAIN GUARDIAN-1 <br />45' BEND / <br />8" DIP WM <br />Y <br />8 RIM: 927.38 <br />6 INV: ,26.38 45° BEND <br />I -I -I -I <br />I <br />C502 <br />4" <br />III <br />Y <br />I <br />I 6 I <br />I <br />6GV W BOX <br />S C502 C502 8" fi"T <br />OUTLET-7 <br />STMH-5 RCP @ 1 00°0 <br />RIM: 92S <br />INV: 924.73 C501 <br />10 8 RIM: 923.70 <br />` I� C501 C501 INV: 919.50 , <br />CO, TYP 1 C. m m <br />Y DT INV: 920.02 DT INV: 920.67 C509 @ LF 18%C503 DT INV: 920.67 <br />I 1 " RCP @ 2.08% <br />DT INV: 919.97 . - . .. - .. .. .. - - - ' ' - DT INV: 919.85 <br />DT INV: 919.91 <br />..ES-3 - ; .. - DT INV: 919.5 <br />C501 INV: 919.00' <br />/ o0 <br />>x I <br />WETLAND 3 <br />/ INCIDENTAL WETLAND PER I C <br />RCWD REVIEW FILE 20-01OR <br />J O I r� 1 II III I c�_ <br />9 I RAIN GUARDIAN-2xo. <br />RIM: 926.69 6 <br />INV: 925.69 C502 <br />ii W <br />9 <br />i <br />CO, TYP <br />DT INV: 920.67 C503 <br />4 I <br />INV 923.53 C501 <br />DT INV: 920.26 <br />DT INV: 920.17 <br />V*DT-INV: 920.07 -� <br />a <br />I <br />a <br />I <br />I � <br />I <br />LEGEND <br />O STORM MANHOLE <br />CTV <br />CABLE UNDERGROUND LINE <br />OE <br />ELECTRIC OVERHEAD LINE <br />O CATCH BASIN <br />UE <br />ELECTRIC UNDERGROUND LINE <br />E3 CURB INLET <br />FO <br />FIBER OPTIC UNDERGROUND LINE <br />- GAS - <br />GAS - <br />NATURAL GAS UNDERGROUND LINE <br />® FLARED END <br />-> <br />>- <br />SANITARY SEWER PIPE <br />O SANITARY MANHOLE <br />>> <br />STORM SEWER PIPE <br />- T <br />T- <br />TELEPHONE UNDERGROUND LINE <br />HYDRANT <br />-I -I <br />-I- <br />WATERMAIN PIPE <br />N GATE VALVE 8 BOX <br />-» <br />DT- <br />DRAINTILE PIPE <br />® WATERSHUTOFF <br />PIPE INSULATION <br />o-0 LIGHT POLE <br />UTILITY NOTES <br />1. It is the responsibility of the contractor to perform or coordinate all necessary utility connections and <br />relocations from existing utility locations to the proposed building, as well as to all onsite amenities. <br />These connections include but are not limited to water, sanitary sewer, cable N, telephone, gas, <br />electric, site lighting, etc. <br />2. All service connections shall be performed in accordance with state and local standard <br />specifications for construction. Utility connections (sanitary sewer, watermain, and storm sewer) <br />may require a permit from the City. <br />3. The contractor shall verify the elevations at proposed connections to existing utilities prior to any <br />demolition or excavation. <br />4. The contractor shall notify all appropriate engineering departments and utility companies 72 hours <br />prior to construction. All necessary precautions shall be made to avoid damage to existing utilities. <br />5. Storm sewer requires testing in accordance with Minnesota plumbing code 4714.1109 where <br />located within 10 feet of waterlines or the building. <br />6. Connect sand subbase draintile to adjacent catch basins or daylight. Provide solid PVC Schedule <br />40 piping when crossing waterlines. <br />7. All RCP pipe shown on the plans shall be MN/DOT class 5. <br />8. Maintain a minimum of 7 %' of cover over all water lines and sanitary sewer lines. Where 7 W of <br />cover is not provided, install 2" rigid polystyrene insulation (MN/DOT 3760) with a thermal <br />resistance of at least 5 and a compressive strength of at least 25 psi. Insulation shall be 8' wide, <br />centered over pipe with 6" sand cushion between pipe and insulation. Where depth is less than <br />use 4" of insulation. <br />9. Install water lines 12" above sewers. Where the sewer is less than 12" below the water line (or <br />above), install sewer piping of materials approved for inside building use for 10 feet on each side of <br />the crossing. <br />10. All watermain piping shall be class 52 ductile iron pipe unless noted otherwise. <br />11. See Project Specifications for bedding requirements. <br />12. Pressure test and disinfect all new watermains in accordance with state and local requirements. <br />13. Sanitary sewer piping shall be PVC, SDR-35 for depths less than 12% PVC SDR-26 for depths <br />between 12' and 26', and class 52 D.I.P. for depths of 26' or more. <br />0 <br />NORTH <br />0 15 30 60 <br />yrcmov� <br />y;a <br />�nmWr� <br />W g3m� r <br />_oo3�V S <br />1 2022 1 <br />A■ <br />UTILITY <br />PLAN <br />C400 <br />