My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
07-22-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2024 2:03:26 PM
Creation date
7/19/2024 9:44:36 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Section 1355.04 Procedural Requirements for Specific Applications <br />A public hearing for a CUP and PUD request is required before the request can be brought before <br />the City Council. The applicant or its representative shall be given the opportunity to appear before <br />the Planning Commission to answer questions or give explanations regarding the proposal. Upon <br />completion of the public hearing and its study and consideration of the application, the Planning <br />Commission shall submit its written report, containing its findings, conclusions, and <br />recommendations as to the application, to the City Council. <br />Plan Evaluation Summary <br />The table below provides the performance standards for the B-2 Zoning District and the <br />preliminary analysis for the proposed development: <br />Ordinance Re uireme <br />B-2 District Standards <br />Proposed Development <br />Maximum Floor Area Ratio (FAR) <br />0.8 <br />0.25 <br />Maximum Building Height <br />50 feet <br />Headquarters Building — 30 feet <br />Training Tower — 42 feet <br />Maximum Structure Coverage <br />45% <br />18% <br />Minimum Landscape Lot Area <br />20% <br />34% <br />Minimum Front Yard Setback <br />50 feet <br />Approx. 90 feet <br />Minimum Rear Yard Setback <br />20 feet <br />136 feet <br />Minimum Side Yard Setback <br />10 feet (min)/ <br />85 feet (south) and 68 feet <br />20 feet (total) <br />(north)/153 feet (total) <br />Building Design - Positioning <br />At Front Setback = 50 feet <br />Building = Approx. 90 <br />Minimum Parking Requirements <br />Public Use - <br />54 Parking Stalls <br />Recommendation from PC <br />Off -Street Parking Setbacks <br />20 feet from ROW/5 feet <br />West (rear) — 46 feet <br />from side & rear lot lines <br />South (side) — 65 feet <br />North side — 20 feet <br />Building Fagade Transparency <br />50% transparency at front <br />Meets Requirements <br />Building Materials <br />75% brick, tile, natural <br />Meets Requirements <br />stone, decorative concrete, <br />transparent glass or any <br />combination thereof <br />Lighting/Photometric Plan <br />Meter reading of no more <br />Meets Requirements <br />than one (1) foot candle on <br />the travel lanes <br />Screening <br />Trash Enclosure <br />Meets Requirements <br />Landscaping <br />Perennial/Shrubs/Planting <br />Seeking Flexibility <br />Islands <br />Landscaping <br />Replacement Trees <br />Seeking Flexibilit <br />Landscaping <br />Boulevard Trees - 7 <br />Meets Requirements <br />Pedestrian and Bicycle Circulation <br />6 foot sidewalk & Bike <br />Meets Requirements <br />Rack <br />Freestanding Sign — Copy Area <br />25 square feet <br />To be verified <br />Freestanding Sign — Total Sign Area <br />37.5 square feet <br />To be verified <br />Wall Signage <br />Sign District 7 <br />28 square feet <br />(Max. 45 square feet) <br />Additional Review <br />Building Official <br />The Building Official has reviewed the plans and has no additional comments at this time. A <br />Building Permit will be required prior to any construction taking place. <br />Page 12 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.