Laserfiche WebLink
F:MMN- I11:"l <br />CITY OF ARDEN HILLS <br />PROJECT: 2024 CIPP Lining <br />PROJECT #: PW-23-0101, 20940.000 <br />CONTRACTOR: Hydro-Klean <br />CONTRACT FOR: Cured -In -Place -Pipe Rehabilitation of Sanitary Sewer <br />Date: <br />Payment i <br />71312024 <br />REM NO. SPEC. NO. ITEM DESCRIPTION <br />UNIT <br />CONTRACT <br />QUANTITY <br />CONTRACT <br />UNIT PRICE <br />CONTRACT <br />AMOUNT <br />QUANTITY AMOUNTEARNED <br />TO DATE TO DATE <br />PERCENT OF <br />CONTRACTAMOUNT <br />QUANTITY <br />AMOUNT <br />BASE BID- 2024 CIPP LINING <br />1 2021.501 MOBILIZATION <br />LUMP SUM <br />1 <br />$6,937.12 <br />$6,937.12 <br />0.00 <br />$0.00 <br />0.00% <br />S0.00 <br />2 2101.524 TRAFFIC CONTROL <br />LUMP SUM <br />1 <br />$1,000.00 <br />$1,000.00 <br />0.00 <br />$0.00 <br />0.00% <br />$0.00 <br />3 2101.524 TEMPORARY CONVEYANCE <br />LUMP SUM <br />1 <br />$500.00 <br />$500.00 <br />0.00 <br />$0.00 <br />0.00% <br />$0.00 <br />4 2104.502 CLEAN& TELEVISE SANITARY SEWER (PRE -REHABILITATION) <br />LIN FT <br />5,727 <br />$6.94 <br />$39,745.38 <br />4,400.00 <br />$30536.00 <br />76.83% <br />4,400.00 <br />$30,536.00 <br />5 2104.503 HEAVY SEWER CLEANING <br />HOUR <br />25 <br />$400.D0 <br />S10,000.00 <br />4.00 <br />$1,60D.00 <br />16.00% <br />4.00 <br />$1,600.00 <br />6 2104.503 TRIM PROTRUDING TAP <br />HOUR <br />5 <br />$400.00 <br />S2,00L00 <br />0.00 <br />$0.00 <br />0.00% <br />$0.00 <br />7 2104.503 CIPP LINING -8"SANITARY SEWER <br />LIN FT <br />5,727 <br />$32.50 <br />$186,127.50 <br />0.00 <br />$100 <br />0.00% <br />$0.00 <br />6 2104,602 REINSTATE SANITARY SEWER SERVICE <br />EACH <br />118 <br />$50.00 <br />S5.900.00 <br />0.00 <br />$0.00 <br />0.00% <br />$0.00 <br />9 2104.504 REINSTATE OUTSIDE DROP <br />EACH <br />1 <br />$50.00 <br />$50.00 <br />0.00 <br />$0.00 <br />0.00% <br />$0.00 <br />10 2104.504 SANITARY SEWER PIPE REPAIR -OPEN -CUT <br />LUMPSUM <br />1 <br />$3Q000.00 <br />S30,000.00 <br />1.00 <br />$30,000.0D <br />IK00% <br />1.00 <br />$30,000.00 <br />ALTERNATE 1- LATERAL CONNECTION SEALING <br />11 Lateral Connection Sealing(5 feet) <br />EACH <br />118 <br />$1,890.00 <br />$223,020.00 <br />0.00 <br />$0.00 <br />0.00% <br />$0.00 <br />SUBTOTAL <br />SUMMARY <br />$505,280.00 <br />$62,13610 <br />12.30% <br />$62J36.00 <br />BASE BID-2024 CIPP LINING $505,280.0D S62,136.0D 12.30% $62,136.00 <br />TOTAL $505,280.00 $62,136.00 12.30% $62,136.D0 <br />