My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-24-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
07-22-24-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 9:50:44 AM
Creation date
7/19/2024 9:50:00 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 4 <br /> <br />franchise fee proposal of $375,000 per year and a property tax levy of $220,000 per year, an <br />increase of $50,000 over 2024, is being provided to show appropriate funding levels in order <br />to meet future project expenditures. <br />• The one-time Public Safety Aid of $433,084 was received in 2023 and is accounted for in the <br />fund balance. <br /> <br />Equipment & Building Replacement Fund <br />• The current plan includes replacing the City Hall roof in 2025, replacing the City Hall air <br />handlers in 2028, and updating the City Hall building in 2029-2030. <br />• The current $100,000 tax levy does not support the needs of this fund. A property tax levy of <br />$210,000 is being proposed for 2025, which is an increase of $110,000 per year from 2024. <br />This change will ensure there is appropriate funding to meet future expenditures. <br /> <br />Utility Funds <br />• Public Works staff continues to evaluate the condition of City utilities throughout the <br />community. The majority of street projects currently include a minimum amount for isolated <br />utility repairs but these amounts could increase as locations are identified where broader <br />water, sanitary sewer and drainage replacement is needed. <br />• For the Sewer Fund, no I&I grant funds have been included in the plan as the amounts are <br />unpredictable. <br />• Rate increase assumptions are as follows: <br /> Water – 2025-2033 (2%) <br /> Sewer – 2025-2033 (3%) <br /> Storm – 2025-2033 (3%) <br /> <br />Council Direction <br />Staff is seeking direction from the City Council regarding the following items: <br /> <br />2025 Projects <br />As we review the 2025 projects, does the Council have any questions, comments or concerns <br />about including them during budget preparation? <br /> <br />2025 Property Tax Levy <br />The levies for the Equipment/Building Replacement ($100,000) and Public Safety Capital <br />($170,000) funds are currently proposed to increase in this plan. What increases, if any, should <br />staff assume? <br /> <br />2025 Rate Increases - Enterprise Funds <br />A rate study was completed in 2018. Annually, staff performs a review to ensure rates are at an <br />appropriate level in order to meet future anticipated expenditures. Rate increase assumptions are <br />proposed in 2025 and in future years in order to maintain a positive fund balance across the three <br />funds. What changes, if any, should staff assume? <br /> <br />Local Government Aid (LGA) <br />The omnibus tax bill includes an $80 million annual increase in local government aid. Arden <br />Hills received $121,471 of LGA in 2024 and is expected to receive $122,592 in 2025. Staff <br />recommends that these funds are not used for general operations (the state has unallotted LGA in <br />the past) but instead direct them toward capital projects. They are included in the PIR Fund in
The URL can be used to link to this page
Your browser does not support the video tag.