My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-24-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
07-22-24-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 9:50:44 AM
Creation date
7/19/2024 9:50:00 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Arden Hills, Minnesota Contact Public Works Director <br />2025 2029 <br />thru Department Water Department <br /> Description <br />Conduct a Water System Model update. <br />Project #25-W-001 <br />Priority 3 Important <br /> Justification <br />The last water model was conducted in 2019. Since then upgrades have been made at critical locations of the water distribution system. An update <br />is needed to show current conditions. <br /> Budget Impact/Other <br />Useful LifeProject Name Water System Model Update Category Utility Improvements <br />Type Operational Maintenance <br />TCAAP No <br />Total Project Cost:$41,500 <br />Total2025 2026 2027 2028 2029Expenditures <br />41,50041,500Planning/Design <br />41,500 41,500Total <br />Total2025 2026 2027 2028 2029Funding Sources <br />41,50041,500Water Utility Funds <br />41,500 41,500Total <br />Produced Using the Plan-It Capital Planning Software <br />56
The URL can be used to link to this page
Your browser does not support the video tag.