Laserfiche WebLink
Capital Improvement Plan <br />City of Arden Hills, Minnesota Contact Public Works Director <br />2025 2029 <br />thru Department Water Department <br /> Description <br />Conduct a Water System Model update. <br />Project #25-W-001 <br />Priority 3 Important <br /> Justification <br />The last water model was conducted in 2019. Since then upgrades have been made at critical locations of the water distribution system. An update <br />is needed to show current conditions. <br /> Budget Impact/Other <br />Useful LifeProject Name Water System Model Update Category Utility Improvements <br />Type Operational Maintenance <br />TCAAP No <br />Total Project Cost:$41,500 <br />Total2025 2026 2027 2028 2029Expenditures <br />41,50041,500Planning/Design <br />41,500 41,500Total <br />Total2025 2026 2027 2028 2029Funding Sources <br />41,50041,500Water Utility Funds <br />41,500 41,500Total <br />Produced Using the Plan-It Capital Planning Software <br />56