My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-24-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
07-22-24-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 9:50:44 AM
Creation date
7/19/2024 9:50:00 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Arden Hills, Minnesota Contact Public Works Director <br />2025 2029 <br />thru Department Water Department <br /> Description <br />Evaluated the condition of 16" water main between North and South towers to determine the degree of corrosion and deterioration in 2020-2021. <br />The evaluation will develop a long-term plan for rehabilitation of this critical water main segment. Inspection via ultrasonic testing is needed to <br />evaluate existing conditions in critical locations along the Trunk Watermain. <br />2026 - Evaluation at Hamline Ave N near Ingerson and Dunlap St N near Ingerson <br />2028 - Inspections and testing at Dunlap St N near Grey Fox Road <br />Project #26-W-003 <br />Priority 2 Very Important <br /> Justification <br />The trunk water main extending between the north and south elevated storage tanks is one of the most important and critical segments of the water <br />distribution system for supplying water to the northern portion of the City. Segments of the water main have been in service for more than 52 years. <br /> Budget Impact/Other <br />Useful Life 10Project Name Trunk Water Main Improvements Category Utility Maintenance <br />Type Unassigned <br />TCAAP No <br />Total Project Cost:$40,000 <br />Total2025 2026 2027 2028 2029Expenditures <br />40,00020,000 20,000Construction/Maintenance <br />20,000 20,000 40,000Total <br />Total2025 2026 2027 2028 2029Funding Sources <br />40,00020,000 20,000Water Utility Funds <br />20,000 20,000 40,000Total <br />Produced Using the Plan-It Capital Planning Software <br />59
The URL can be used to link to this page
Your browser does not support the video tag.