Laserfiche WebLink
Progress Estimate - Unit Price Work <br />Owner: City of Arden Hills <br />Engineer: Bolton & Menk, Inc. <br />Contractor: S.M. Hentges & Sons, Inc. <br />Project: 2024 PMP Street & Utility Improvements <br />Contract: 2024 PMP Street & Utility Improvements <br />Application No.: 3 Application Period: From 06/29/24 to 08/01/24 <br />A B C D E F F1 F2 G H <br />Contract Information Previous Estimate Work Completed <br />uescription <br />SANITARY SEWER SPOT REPAIR <br />JOINT SEALING SANITARY MANHOLE <br />REINSTATE LATERALS <br />SEWER PIPE GROUTING <br />LINING SEWER PIPE 12" <br />LINING SEWER PIPE 12" (STORM) <br />CEMENTITIOUS LINING SANITARY MANHOLE <br />TEMPORARY WATER SERVICE <br />CONNECTTO EXISTING WATERMAIN <br />HYDRANT <br />VALVE BOX <br />ADJUST VALVE BOX <br />1" CORPORATION STOP <br />6" GATE VALVE & BOX <br />8" GATE VALVE & BOX <br />12" GATE VALE & BOX <br />1" CURB STOP & BOX <br />1" TYPE PE PIPE <br />6" WATERMAIN DUCTILE IRON CL 52 <br />12" WATERMAIN DUCTILE IRON CL 52 <br />8" PVC WATERMAIN (C900) <br />4" POLYSTYRENE INSULATION <br />DUCTILE IRON FITTINGS <br />CASTING ASSEMBLY (SANITARY) <br />CASTING ASSEMBLY (STORM) <br />ADJUST FRAME & RING CASTING (STORM) <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN H <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL (2'X3' CB) <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4022 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 96-4020 <br />GROUT CATCH BASIN OR MANHOLE <br />SAFL BAFFLE <br />RANDOM RIPRAP CLASS III <br />6" CONCRETE WALK <br />3" BITUMINOUS WALK <br />DRILL & GROUT REINF BAR (EPDXY COATED) <br />CONCRETE CURB & GUTTER DESIGN B618 <br />CONCRETE CURB & GUTTER DESIGN B618 (SPOT) <br />CONCRETE CURB & GUTTER DESIGN SPECIAL SURMOUNTABLE (SPOT) <br />6" CONCRETE DRIVEWAY PAVEMENT <br />7" CONCRETE VALLEY GUTTER <br />TRUNCATED DOMES <br />INSTALL MAILBOX SUPPORT <br />TRAFFIC CONTROL <br />SIGN PANELS TYPE C <br />INSTALL SIGN <br />DECIDUOUS TREE 2.5" CAL B&B <br />TREE PRUNING <br />STABILIZED CONSTRUCTION EXIT <br />STORM DRAIN INLET PROTECTION <br />SILT FENCE, TYPE MS <br />Item Quantity Units <br />1.00 EACH <br />1.00 EACH <br />4.00 EACH <br />8.00 EACH <br />650.00 LIN FT <br />543.00 LIN FT <br />9.00 LIN FT <br />1.00 LUMP SUM <br />6.00 EACH <br />1.00 EACH <br />5.00 EACH <br />19.00 EACH <br />4.00 EACH <br />2.00 EACH <br />3.00 EACH <br />2.00 EACH <br />4.00 EACH <br />171.00 LIN FT <br />12.00 LIN FT <br />39.00 LIN FT <br />625.00 LIN FT <br />12.00 SQ YD <br />353.00 LB <br />46.00 EACH <br />58.00 EACH <br />2.00 EACH <br />4.00 LIN FT <br />8.00 LIN FT <br />26.00 LIN FT <br />81.00 LIN FT <br />7.00 LIN FT <br />9.00 LIN FT <br />19.00 EACH <br />8.00 EACH <br />68.00 CU YD <br />80.00 SQ FT <br />4,565.00 SQ FT <br />12.00 EACH <br />1,002.00 LIN FT <br />722.00 LIN FT <br />2,172.00 LIN FT <br />250.00 SQ YD <br />18.00 SQ YD <br />36.00 SQ FT <br />4.00 EACH <br />1.00 LUMP SUM <br />2.50 SQ FT <br />4.00 EACH <br />10.00 EACH <br />10.00 HOUR <br />1.00 LUMP SUM <br />67.00 EACH <br />200.00 LIN FT <br />Value of Bid Item <br />Unit Price I (C X E) <br />5,990.00 <br />5,990.00 <br />2,650.00 <br />2,650.00 <br />160.00 <br />640.00 <br />2,400.00 <br />19,200.00 <br />82.00 <br />53,300.00 <br />82.00 <br />44,526.00 <br />750.00 <br />6,750.00 <br />12,400.00 <br />12,400.00 <br />1,850.00 <br />11,100.00 <br />7,150.00 <br />7,150.00 <br />835.00 <br />4,175.00 <br />460.00 <br />8,740.00 <br />890.00 <br />3,560.00 <br />3,230.00 <br />6,460.00 <br />4,200.00 <br />12,600.00 <br />7,000.00 <br />14,000.00 <br />1,000.00 <br />4,000.00 <br />48.00 <br />8,208.00 <br />150.00 <br />1,800.00 <br />220.00 <br />8,580.00 <br />51.00 <br />31,875.00 <br />115.00 <br />1,380.00 <br />19.00 <br />6,707.00 <br />950.00 <br />43,700.00 <br />980.00 <br />56,840.00 <br />770.00 <br />1,540.00 <br />610.00 <br />2,440.00 <br />405.00 <br />3,240.00 <br />540.00 <br />14,040.00 <br />500.00 <br />40,500.00 <br />845.00 <br />5,915.00 <br />1,770.00 <br />15,930.00 <br />460.00 <br />8,740.00 <br />6,800.00 <br />54,400.00 <br />200.00 <br />13,600.00 <br />16.80 <br />1,344.00 <br />2.20 <br />10,043.00 <br />9.00 <br />108.00 <br />23.50 <br />23,547.00 <br />42.00 <br />30,324.00 <br />38.50 <br />83,622.00 <br />91.00 <br />22,750.00 <br />125.00 <br />2,250.00 <br />55.00 <br />1,980.00 <br />300.00 <br />1,200.00 <br />10,200.00 <br />10,200.00 <br />35.00 <br />87.50 <br />270.00 <br />1,080.00 <br />950.00 <br />9,500.00 <br />320.00 <br />3,200.00 <br />5,000.00 <br />5,000.00 <br />165.00 <br />11,055.00 <br />4.25 <br />850.00 <br />Quantity Previous <br />Estimate <br />1.00 <br />1.00 <br />6.00 <br />1.00 <br />1.00 <br />5.00 <br />2.00 <br />3.00 <br />2.00 <br />4.00 <br />168.00 <br />12.00 <br />43.00 <br />704.00 <br />426.00 <br />37.00 <br />7.08 <br />8.03 <br />11.35 <br />81.11 <br />6.60 <br />8.77 <br />21.00 <br />717.00 <br />1,884.00 <br />265.00 <br />18.00 <br />0.75 <br />67.00 <br />Value Previous <br />Estimate <br />5,990.00 <br />12,400.00 <br />11,100.00 <br />7,150.00 <br />835.00 <br />4,450.00 <br />6,460.00 <br />12,600.00 <br />14,000.00 <br />4,000.00 <br />8,064.00 <br />1,800.00 <br />9,460.00 <br />35,904.00 <br />8,094.00 <br />36,260.00 <br />4,318.80 <br />3,252.15 <br />6,129.00 <br />40,555.00 <br />5,577.00 <br />15,522.90 <br />4,200.00 <br />16,849.50 <br />72,534.00 <br />24,115.00 <br />2,250.00 <br />7,650.00 <br />11,055.00 <br />Estimated <br />Quantity <br />Incorporated in <br />the Work <br />1.00 <br />650.00 <br />543.00 <br />1.00 <br />6.00 <br />1.00 <br />1.00 <br />5.00 <br />2.00 <br />3.00 <br />2.00 <br />4.00 <br />168.00 <br />12.00 <br />43.00 <br />704.00 <br />426.00 <br />37.00 <br />7.08 <br />8.03 <br />20.47 <br />81.11 <br />6.60 <br />8.77 <br />8.00 <br />26.00 <br />4,565.00 <br />867.00 <br />1,884.00 <br />265.00 <br />18.00 <br />4.00 <br />1.00 <br />2.50 <br />1.00 <br />67.00 <br />Value of Work <br />Completed to Date <br />(E X G) <br />5,990.00 <br />53,300.00 <br />44,526.00 <br />12,400.00 <br />11,100.00 <br />7,150.00 <br />835.00 <br />4,450.00 <br />6,460.00 <br />12,600.00 <br />14,000.00 <br />4,000.00 <br />8,064.00 <br />1,800.00 <br />9,460.00 <br />35,904.00 <br />8,094.00 <br />36,260.00 <br />4,318.80 <br />3,252.15 <br />11,053.80 <br />40,555.00 <br />5,577.00 <br />15,522.90 <br />54,400.00 <br />5,200.00 <br />10,043.00 <br />20,374.50 <br />72,534.00 <br />24,115.00 <br />2,250.00 <br />1,200.00 <br />10,200.00 <br />87.50 <br />270.00 <br />11,055.00 <br />Contractor's Application for Payment <br />Owner's Project No.: <br />Engineer's Project No.: <br />Agency's Project No.: <br />Application Date: <br />I <br />Materials Currently <br />Stored (not in G) <br />PW-24-0100 <br />OT1.130168 <br />08/02/24 <br />J I K L <br />Work Completed <br />and Materials <br />Stored to Date <br />(H+I) <br />5,990.00 <br />53,300.00 <br />44,526.00 <br />12,400.00 <br />11,100.00 <br />7,150.00 <br />835.00 <br />4,450.00 <br />6,460.00 <br />12,600.00 <br />14,000.00 <br />4,000.00 <br />8,064.00 <br />1,800.00 <br />9,460.00 <br />35,904.00 <br />8,094.00 <br />36,260.00 <br />4,318.80 <br />3,252.15 <br />11,053.80 <br />40, 55 5.00 <br />5,577.00 <br />15,522.90 <br />54,400.00 <br />5,200.00 <br />10,043.00 <br />20,374.50 <br />72,534.00 <br />24,115.00 <br />2,250.00 <br />1,200.00 <br />10,200.00 <br />87.50 <br />270.00 <br />11,055.00 <br />of <br />Value of <br />Item <br />(J/F) <br />100% <br />100% <br />100 <br />100% <br />100% <br />100% <br />20% <br />125% <br />100% <br />100% <br />100% <br />100% <br />98% <br />100 <br />110 <br />113 <br />121 <br />64 <br />177% <br />100% <br />79% <br />100% <br />94 <br />97% <br />100 <br />38% <br />100 <br />87 <br />87 <br />106 <br />100% <br />100% <br />100% <br />100% <br />25% <br />100% <br />Balance to Finish <br />(F - J) <br />2,650.00 <br />640.00 <br />19,200.00 <br />6,750.00 <br />3,340.00 <br />8,740.00 <br />(890.00) <br />144.00 <br />(880.00) <br />(4,029.00) <br />1,380.00 <br />(1,387.00) <br />43, 700.00 <br />20,580.00 <br />1,540.00 <br />(1,878.80) <br />(12.15) <br />2,986.20 <br />(55.00) <br />338.00 <br />407.10 <br />8,740.00 <br />8,400.00 <br />1,344.00 <br />108.00 <br />3,172.50 <br />30,324.00 <br />11,088.00 <br />(1,365.00) <br />1,980.00 <br />810.00 <br />9,500.00 <br />3,200.00 <br />5,000.00 <br />850.00 <br />EJCDC C-620 Contractor's Application for Payment <br />Unit Price (c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 2 of 4 <br />