Laserfiche WebLink
ATTACHMENT A <br />Project Budget <br />SCHEDULE "C" - ALTERNATE 2 (POND DREDGING) <br />134 <br />2021.501 MOBILIZATION <br />LUMP SUM 1.0 $4,200.00 <br />$4,200.00 <br />136 <br />2106.507 MUCK EXCAVATION (POND 2) <br />(EV)(P) CU YD 395.0 $110.00 <br />$43,450.00 <br />138 <br />2106.601 POND DEWATERING (POND 2) <br />LUMP SUM 1.0 $2,930.00 <br />$2,930.00 <br />139 <br />2573.503 SILT FENCE, TYPE MS <br />LIN FT 1,541.0 $2.40 <br />$3,698.40 <br />PW 2023-22 Page 7 of 9 <br />