<br />14 <br /> <br />Pothole Patching – Public Works fills potholes citywide twice annually. Operations begin as <br />temperatures start to rise at the end of winter and potholes begin to form. In the early weeks, Public <br />Works will use a “cold-mix” type of fill material to fill in severe potholes until bituminous plants open <br />(usually late March/early April) and we can purchase “hot-mix” material. The next full citywide pothole <br />patching operations will happen in the fall to prepare for winter plowing. Throughout the summer <br />months Public Works will address potholes as they are noticed or reported. <br />Spot mill and patching will be completed by PW staff within the orange highlighted streets on the map <br />below. This work is in preparation for the 2025 seal coating/crack filling maintenance project. The <br />projected 6-year street maintenance cycle is primarily for sealcoat and crack filling maintenance <br />planning. <br />