Laserfiche WebLink
<br />25 <br /> <br />2024 Sanitary Sewer Maintenance Plan <br /> <br />The 2024 sewer cleaning and televising will be located within the south west third of the city. Per the <br />city’s sewer maintenance policy and guidelines provided by the LMC, below are the cleaning and <br />televising intervals. <br />• VCP clean or televise every 3 years. Root cut with hydraulic attachment and proofer as needed. <br />Televising will be saved on the cities network drive and can determine if cleaning or root cutting <br />is needed within a VCP mainline. Any mainline cleaning data is saved in the field to the cities GIS <br />database through a mobile application. <br />• CIP and RCP will be televised and determined if hydraulic cleaning and or root cutting is needed. <br />• PVC and CIPP clean and spot televise every 5 years. Dead ends can be flushed using the tanker <br />to “quick dump”. This will be recorded as the mainline is “clean” up to 2 Line segments <br />downstream. <br />• The city is divided in one-third sections. For example, in 2024 PW staff will complete the south <br />west third of the city. This cycles cleaning and televising efforts on a 3-year cycle to clean all VCP <br />(Category 2 sewer mains). While working in the south west third, PW staff also assess category 1 <br />and 3 for cleaning needs. <br /> <br /> <br /> <br />