Laserfiche WebLink
<br />29 <br /> <br />Sanitary Sewer Lift Stations Preventative Maintenance (14 stations)- <br />• Daily lift station checks by PW Staff. <br /> <br />Performed in the spring and fall each year- Clean wet wells, remove grease, solids, and organics from <br />floats, transducers, pumps, rails, walls and floors. Remove pumps and inspect tolerances, vlutes, <br />impellers, flush valves (where applicable) motor oil or coolant levels and quality. Create a plan for any <br />part replacement needs as needed during inspection and make needed repairs. Test all alarms and verify <br />the monitoring system is functioning properly. Inspect the control panel and report any issues in overall <br />condition and functionality. <br />Lift Station Location Maps <br /> <br />